Drilling site supervisor
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
I am interested in expanding my professional horizons by seeking new challenge in the area engineering and operations of drilling in offshore and onshore rigs
Professional Experience
WORK EXPERIENCE:-
FROM 1976 TO 1977 :
DRILLING SUPERVISOR ON A DRILLING RIG FOR WATER WELLS PROJECT IN WESTREN DESERT.
FROM 1977 TO 1981 :
EMPLOYED BY GUPCO , AMOCO EGYPT IN THE CAPACITY OF DRILLING &WORKOVER ENGINEER WORKING AT THE SHORE BASE IN RAS SHUKHIER GULF OF SUEZ, EGYPT.
FROM 1981 TO 1991 :
EMPLOYED BY GUPCO AS DRILLING SUPERVISOR ON VARIOUS OFFSHORE JACK UPS & TENDER ASSISTED RIGS, INVOLVED IN DRILLING AND WORKOVER OPERATIONS IN RAS SHUKHIER GULF OF SUEZ(RED SEA ), EGYPT.
FROM 1991 TO 2003 : ( ABU DHABI BASE ).
EMPLOYED BY ABU DHABI ONSHORE OIL OPERATIONS COMPANY (ADCO)
,ABU DHABI,. I WORKED IN DIFRRENT POSITION AS DRILLING/ WORKOVER OPERATIONS SENIOR OPER. ENG. AND DRLG TEAM LEADER, RESPONSIBLE FOR ALL ENGINEERING &OPERATIONS ASPECTS RELATED TO THREE DRILLING LAND RIGS .
2003 TO 2005 : ( LONG CYCLE WORK 28/28 DAYS)
EMPLOYED BY ABU DHABI ONSHORE OIL OPERATIONS COMPANY (ADCO)
AS DRILLING SITE SUPERVISOR ON LAND RIGS RESPONSIBLE FOR DRILLING AND WORKOVER OPERATIONS TO ACHIEVE COMPANY PROGRAMS, OPERATIONS COVERED ALL TYPES OF COMPLETIONS STRINGS, - RUN& CEMENT ALL SIZE OF CASING AND LINER IN DEVIATED AND LATERAL HOLES.DRILLED MULTI LATERAL HOLES & EXTENDED REACH WELL & HTHP GAS DEEP WELL .
2005 TO 2006 : ( LONG CYCLE WORK 35/35 DAYS).
EMPLOYED BY DRAGON OIL TURKOMSTAN
AS DRILLING SITE SUPERVISOR ON OFFSHORE RIG RESPONSIBLE FOR DRILLING & WORKOVER OPERATIONS TO ACHIEVE COMPANY PROGRAMS, .DRILLED WELLS LAM 112,114 ,115 HTHP DEEP WELL .
2006 TO present : ( LONG CYCLE WORK 28/28 DAYS).
EMPLOYED BY WEATHERFORD IDS IN NORTH AFRICA.
AS SENOIR DRILLING SUPERVISOR RESPONSIBLE FOR DRILLING & WORKOVER OPERATIONS TO ACHIEVE COMPANY PROGRAMS, DRILLED HTHP DEEP WELL TO 4700m.
Eductation
BACHELOR OF SCIENCE PETROLEUM ENGINEERING
(1976), SUEZ CANAL ,EGY
Certification
IWCF SUPERVISOR LEVEL WELL CONTROL SCHOOL
Additional Information
I would like to elaborate about my experience in oil well workover branch as I have 35 years experience in different position and I have the experience in work over as following:-
Offshore /onshore rigs :kill well with different method of killing as bullheading or wait& wait method using different killing fluid water up to Calcium bromide. Retrieve any type of completion gas or oil tube single or dual. Nipple down well head and dress csg stub. repair collapsed casing and batch same using weatherford casing batch. cut tubing or casing with internal or external cutter. Fish and mill completion string and retrieve production packers with bow spear or overshot tool. Mill 7'' liner using tri state metal munsher and do hole side track. Squeeze cement plug and isolate formation communication. Perforate using wire line or TCP guns. run gas or oil completing string single ,dual and multi lateral .
Rigless operation in stimulation well to flow and acidizing and test lateral holes well. kill well and run logs across later hole .unload well.
Snubbing unit(Cudd) 225 k in Lam wells platform in turkomstan to kill high pressure well 5000psi WHP and retrieved 2.7/8'' tubing , fish and mill with slim motor, spot and dress cement plugs.
Hot Categories
Chemicals
Batteries