Electrical Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 9 years
Relocation: Yes - Internationally
Career Objective
Seeking oil gas related job for project management.
Professional Experience
Presson Descon International Pvt. Ltd. From August 2008 to Present
As a Senior Engineer E&I
Working with PDIL as a Senior Engineer Instrument for EPCC Projects in Pakistan and abroad.
Presently engaged in modification work of Substations and Installation of Continuous Emission Monitoring System at GTG & Boiler Stacks in QATAR GAS; Qatar.
British Petroleum Pakistan From August 2007 to August 2008
As an Site Engineer (E & I)
Pipelink Construction (Pvt.) LTD. (PCL) From July 2006 to August 2007
As an E&I Engineer.
Company involved in OIL & GAS Sector for construction of Mechanical, E & I & Civil Works.
PROFESSIONAL PROJECTS UNDERTAKEN
SAINDAK Copper and Gold Project with MRDL(CHINA) from August 2005 to July 2006
As an Electrical Engineer in 50MW Power Plant.
DADABHOY Energy Supply Company Limited from March 2003 to August 2005.
As an Assistant Engineer (Electrical) in 16MW Power Plant.
Job Responsibilities
Formulate to Preventive and Routine maintenance schedules of machinery installed and electrical/electronics equipments/instruments like Relays, Switches Gears, Switches, Controllers, Transmitters, PLC S-5 and S-7, Troubleshooting, Electrical & Instrument Installation and Commissioning. Documentation concerned with the system and operation.
ERA Group of Companies from Apr, 2000 to Nov. 2000.
As Sales Engineer (Instrument)
Job Responsibilities
• Calibration & Installation of different Industrial processing Instruments / equipments, like transmitters, switches, controllers, etc.. according to the ISO 9000.
• Maintenance & Commissioning after sales.
• Business Development.
SYSTEM NETWORKING
At House of Technology from Dec 2000 to Nov 2001
As System Engineer
Projects Completed
Implementation of a Local Area Network at House of Technology, based on 10 workstation and NT Server Operating System and working email software like MS Outlook Express, and all PC’s Connected Intel 4 port Switch, Baylan 12 Port Hub and using CAT 5 Structured Cabling. Configured 10 workstations with Windows 98 operating system to access the Internet, email, file and printing services provided on local server.
Domain name parking, email and Internet services setup using Microsoft Internet information Server.
Eductation
Bachelors of Electronics Engineering (2000)
First Division
NED University Of Engineering & Technology Karachi.
B.Sc. (Statistics)
Second Division
S.A.L.U. Khairpur Mirs.
Hot Categories
Chemicals
Batteries