Electrical Engineer Resumes - Above 5 years experience
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 5 years
Relocation: Yes - Domestically
Career Objective
*Eager and willing to learn new skills.
*Good communication and excellent interpersonal skills.
*Work well under pressure and ability to meet deadlines.
*Team player with good leadership skills cooperative.
*Microsoft Office as Word, Excel.
Professional Experience
Work Experiences in UAE:-
„« Estimation Department
From Mac 2007- July 2007 (5months)
M/s ETA M&E Division, Abu Dhabi, UAE
„« Electrical Engineer in Villa Complex at Al Yasat Island
(H.H President UAE),
From August 2007 till present
M/S ETA M&E Division, Abu Dhabi, UAE
Project Involved in UAE:-
List of Major Job at ETA M&E Division
„« Project Executive at Estimation Department to do survey on quantity of material needed for the project.
Materials: Lights, Power, CCTVs, MATV, SMATV, Telephone, Voice Alarm and Fire Alarms.
Duration: 5 months (Mac 2007 ¡V July 2007)
„« Eruction and Commissioning of Electrical Panels
Equipments: HV Generator, Main MHV Switchgears, Generator Synchronising Panels, Transformers, LV Switchgears like; MDB¡¦s, SMDB¡¦s, ATS, DB¡¦s, Feeder Pillars, Capacitors Banks, DC System battery chargers and battery banks, fuel tanks, pump control panel, earthing system for Palace of H.H President UAE at Al-Yasat Island.
Duration: 5 months (August 2007 ¡V December 2007)
„« Operation & Maintenance of 11kv Diesel Generator Power Stations & Substations for Palace of H.H President UAE at Al-Yasat Island
Client: office of the H.H The President of UAE
Duration: Jan 2008 till now
Eductation
Educational Qualification:-
Diploma in Electrical and Electronic Engineering
Aggregate: 78% (First Class with Honour)
Year: April-2006
Al-Ameen Polytechnic,
Erode,
Tamil Nadu,
India.
Additional Information
„« 11KV ABB Panel installation Testing and maintenance ( CT, VT, Bus bar torque, contact resistance testing, Hi-pot testing ).
„« 11KV Power Transformers installation, testing and maintenance (oil filling, winding resistance, insulation resistance, winding ratio).
„« 11KV Cable termination, jointing, insulation resistance and HIPOT test.
„« Experience with 440 VAC substation components.
„« Commercial electrical installation and maintenance, troubleshooting, and controls.
„« Calculation of Voltage Drop.
„« UPS, batteries installation testing and maintenance.
„« All types of Indoor outdoor lighting system installation testing and maintenance.
„« Install electrical systems for projects/renovations.
„« Commission of Electrical Equipment¡¦s and its auxiliaries.
Hot Categories
Chemicals
Batteries