Resume
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 11 years
Relocation: Yes - Internationally
Career Objective
Construction - Hydro testing - Commissioning
- QA/QC - Operations
Professional Experience
Since 10th Feb2012 to till date m/s. PUNJLLOYD LTD, Myanmar at Myanmar-China Pipeline Project
Client: South East Asia Gas Pipeline Company Ltd , South East Asia Crude Oil Pipeline Company Ltd,China.
Project Consultant: Beijing Xing You Engineering Management Co. Ltd, China.
The Growth Path:
As Deputy Manager - Commissioning & Hydro test .
Responsible for New cross country Pipeline Cleaning , Gauging , flooding , Hydro testing, Dewatering, Swabbing and Drying (Gas 40-160KM, Oil 32-140KM API5LX70 Pipe Wall.Thk-14.6,16.9,17.5 ),Intelligent Caliper Pigging, Pre-Commissioning.
The Key Deliverables:
40 X 160KM 1 No Gas Pipeline and 32X 140 KM 1 No Crude Oil Line.
Prepared to Method of Statement & Procedures, Test Plan , Elevation Diagram , Testing Header.
Attending contractual meeting and hydro test meeting with client and consultant .
Hydro testing of station piping and plant pipings.
Inspection of pipes internal cleaning and Gauging Plate.
Test Pack Co-coordinating and Preparation of final documents for handing over to client.
Maintain and implement construction/commissioning activity in cross country pipeline and water distribution system.
Carry out any other duties as required by the direct supervisor.
Attend job progress meetings, Report job performance, keep Up to date recommended procedure, and circulate information applicable to each level of employees.
Over all responsibility of every hydro testing related activity in cross country pipeline, Main line testing header fabrication, air pigging header fabrication and pre testing of header.
Hydro testing of anti-corrosive protective system pipelines.
Cleaning, gauging, and preparation of hydro testing section.
Water filling, thermal stabilization, pressurizing, air volume calculation, hold period recording.
After testing, dewatering swabbing and calliper pigging. Testing of all valve station including of launcher and receiver.
After calliper pigging, drying activity carried out. Drying unto -15*C dew Point and hold period 24 hrs.
Nitrogen purging started after acceptance of drying , fill the section with nitrogen having purity of 99.98% unto 0.5 bars.
Identification of test loops, preparation of test packages and coordinating for Hydro test.
Eductation
o ASNT Level II in RT, UT, LPT & MPT.
o Worked as 1 year (2002-2003) apprentice at Bharath Electronics Ltd., Bangalore.
o Implant Training from Bimetal Bearings Ltd., Hosur
o Fire fighting and fire prevention.
o PDO - HSE ,H²S .SLS, CMC, IFR Course Conducted for STS Training Centre, Oman.
Certification
2000 Diploma in Mechanical Engineering .
1996 SSLC from State Board of Secondary Education, Tamilnadu.
IT SKILLS: MS office, Auto CAD 14 & 2000, Solid Works
Additional Information
Hydro testing & Commissioning of Cross country Pipeline & Station Piping
Planning, Controlling, Monitoring and Schedule the work and efficiently organize the site / facilities in order to meet an agreed programme of deadlines by Reporting Daily, Weekly and Monthly Progress Reports.
Duties include approval of construction modifications, drawings and checking material quantities, types and suitability.
In addition I have marked up as builds and generally been solving installation / design problems throughout the site.
Getting the work done by the contractor as per the scope of work & standard of project procedures.
Coordinating with engineering team for Technical queries / clarification.
Hot Categories
Chemicals
Batteries