Career Objective
To implement and enhance my skills and knowledge of development in a good environment. I am deeply interested in enhancing my skills in the field of Electrical Engineering. I wish that I will be successful by the grace of Almighty ALLAH.
Professional Experience
DEC2010 – PRESENT Sapphire finishing mills. (Power Generation)
Plant Capacity: 10 MW
Plant Detail: Jenbacher JGS320 (1MW)*4
Cater pillar 3512 (1MW)*3
Cater Pillar 3516 (1.6MW)*1
As an Electrical Engineer (I & C):
• Worked on Pressure, Temperature, Level and Flow Loops.
• Calibration of Pressure Regulators, Pressure Transmitters and Pressure Gauges.
• Worked on thermocouples, RTD and temperature Controllers.
• Worked on Pneumatic valves, Pressure Regulating valve and solenoid valves.
• Calibration and maintenance of control valves.
• Calibration of level flow temperature and pressure switches.
• Calibration of Oil Mist Detector (OMD).
• Worked at Boilers Instrumentation.
• General troubles shooting.
• Worked on Parallel operation of Jenbacher gas & cater pillar diesel engines to wapda (132kv)
• Done Commissioning of Air Circuit Breaker, Bus bar & Auxiliary control panel.
• Maintenance experience of 1 MW Gas/Diesel engine (Jenbacher & cater Pillar).
NOV2009 – NOV2010 Siemens Pakistan Engineering Co. Ltd
As a Trainee Engineer my responsibilities included:
• Design procedure in transformer making.
• To handle the inspection of transformer with wapda inspection team.
• Complete Testing of transformers according to the consumer requirements.
• To assure and control the quality matters during transformer manufacturing process.
AUG2008 – SEP2008 Pak Electron Limited (PEL).
As an internee my responsibilities included:
• Go through Switch Gear manufacturing process.
• Examine MV and LV Switch gears.
• Go through the testing procedure of switch gear.
Eductation
2005-2009 B.Sc. Electrical Engineering.
Faculty of Engineering, University of Central Punjab, Lahore.
2003-2005 F.Sc. (Pre-Engineering).
Punjab College of Science, Lahore.
2001-2003 Matric (Science)
Iqra Public High School, Lahore.
Additional Information
PROJECTS: ________________________________________________________________________
• Final Year Project: GSM based Energy meter.
• Power Electronics: Speed control of DC motor.
• Digital Electronics: Uninterrupted Power Supply.
• Instrumentation & Measurement: Digital Voltmeter.
• Microwave Engineering: Digital Micro strip Antenna at 7GHz frequency using HFSS.
TECHNICAL SKILLS ____________________________________________________________________________
Languages: C++, Verilog HDL, MATLAB, Assembly.
Softwares: Electronics Workbench, AutoCAD2004, PSPICE, C6713 DSP kits, Xilinx
Spartan 3 FPGA Kit, Auto Cad, MS Office.
ACHIEVEMENTS:
____________________________________________________________________________
• Finance Secretary of Society of Electronics & Telecommunications (SET), University of Central Punjab for year 2007.
• Secretary Co-ordination of Society of Electronics & Telecommunications (SET), University of Central Punjab for year 2008.