Egypt Zones accountACCOUNT

Package & Rotating Equipment Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 10 years
Relocation: Yes - Internationally

Industry Experience
10 years Mechanical Engineer

Career Objective

Seeking Lead level assignments in Rotating and Packaged equipment engineering with an organization of repute in Oil and Gas sector.

Professional Experience

PROFILE SUMMARY
• Over 9.6 years of experience in detailed engineering of Rotating and Packaged Equipment in Oil and Gas sector.
•Currently working as packaged equipment lead engineer for Chevron Phillips Chemical’s US gulf coast Polyethylene project.
• Extensive experience in Package and Rotating equipment engineering with hands on experience in engineering and selection of API 610 pumps, ANSI B73.1 pumps, API 674 and 675 pumps, Blowers, Air dryer package, Cooling tower package, Side stream filtration package, chlorination package , Chlorine dioxide package, pH control package, chain pulley blocks, hoists, Raw water treatment package, Effluent treatment package, Spray water systems, Foam systems, Automatic valveless gravity filters, Marine loading arms, truck loading arms, sea water intake bandscreen package, ASME section VIII div 1 vessels, cooling water pumps, oil mist lube systems, central vacuum system, elevators, potable water package.

Experience
Principal Engineer- Technip: Aug 2013- Present
•Preparation of RFQ / RFP for Rotary Equipment and packaged equipment and the bid evaluations.
•Experience in Vendor Drawing Review, Interfacing coordination with Client / EPC Contractor / Vendor.
•Prepared man-hour estimates, design specification, scopes of work, scheduling and estimations, and project progress reporting.
•Hands on experience in preparing technical specifications, material selection, preparing data sheets, sizing, selection and performance evaluation of oil and gas industry equipment.
•Coordinated workflow within the engineering team, executed mechanical engineering scope, reviewed mechanical drawing content, reinforced and promoted quality and safety standards, interfaced with client and vendor engineering staff of projects.

Senior Manager- Reliance Industries Limited: Aug 2004- July 2013
Roles and Responsibilities
•Preparation of datasheet & Material requisition for quotation & Purchase
•Preparation of standard specification and project specifications for equipment.
•Preparation of Technical Bid Evaluation and technical query (TQ) clarification with vendors.
•Conducting and participating in Pre-Order, Kick-Off and post order meeting with vendors.
•Inter discipline coordination and providing inputs to other disciplines like foundation loads, weight data, electrical load etc.
•Vendor print review

Eductation

B.E. (Mechanical)(2000-2004) Parshvanath College of Engineering Mumbai University 64.85%(Aggregate)

H.S.C. (1999) M. H. Saboo Siddik Junior College, Mumbai Maharastra Board 82.5%

S.S.C (1997) Our lady of Valankinni high School Maharastra Board
80%

Additional Information

Projects Handled

2013-2013
ENRU project- GASCO –Abu Dhabi
FEED of rotating equipments including boiler feed water pumps, hydrocarbon pumps, sealless pump, reciprocating pumps and vertical pumps.

2013- 2014
USGC polyethylene project- CPCHEM –USA
Detailed engineering of packages consisting of cooling tower, Oil mist lubrication package, Bridge crane package, Railroad unloading arms, potable water treatment package, Raw water treatment package, API separator package, Cooling tower injection package, Elevators, Catalyst unloading stations, Central vacuum system, Automatic samplers, Polished water package.

2007-2009

Jamnagar Export Refinery Project(JERP)
Equipment handled – Spray water system for tankages confirming to NFPA, Sea water intake bandscreen package, Cooling water side stream filter unit, cooling water pumps.

2009-2011 Butene 1 Project
Equipment handled – Cooling water pumps, Gas Blowers, Loading Arms, Pressure vessel.
2010-2012 DTA ETP Debottlenecking project
-Equipment handled – Cooling water pumps, Chlorination package, Chlorine dioxide package, pH control package.
2010-2012 Hazira OSBL Integration Project
-Equipment handled – Raw water treatment package, Air Dryer package, Automatic valveless gravity filter, Butadiene, styrene & heptane unloading arm, chain pulley block.

2011-present EO-EG debottlenecking project
-Equipment handled – Absorber condensate pump, Caustic dosing pump.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.