COMPLETION DISTRICT MANAGER
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 15 years
Relocation: Yes - Internationally
Career Objective
My main objective is working as a manager, senior completion engineer, completion supervisor or team leader for well completion operations with integrated reservoir aspect.
Professional Experience
Now I am manager of well completion department of Turkish Petroleum Corporation in Turkey. My team is total 151 crew. 12-petroleum engineer, 3-mechanical engineer, 9-logging engineer, 5-electronic engineer and 122 other crew. My company ‘’ Turkish Petroleum Corporation (TPAO)’’ has 18 own drilling rigs(NOV, DM-1500, F-200, F-320), 11 workover rigs(NOV 5C, NOV 4C, Ideco, IRI, Cooper), logging truck and systems(Halliburton), VSP equipment and truck, fishing equipments(BOWEN), Power swivels(BOWEN), Mud Pumps(Gardner Denver)….. We can do nearly everything ourselves. Only we are using sub contractor for directional drilling.
We do workover operations ourselves, cementing operations ourselves, acidizing operations ourselves, logging and perforating operations ourselves, fishing operations, down hole tools redress, set, unset operations. We do nearly all operations ourselves. We are using Halliburton, BJ, Baker, NOV down hole equipment. We drilled 102 wells last year.
I am managing all well completion and workover operations in my district. In my district I am responsible for 5 drilling rigs, 6 workover rigs, 4 logging trucks, system and tools, 3 cementing trucks, 3 stimulation pump truck, 5 DST set. We drilled 22 wells last year and we did all cementing operations, DST operations, perforations, stimulation operations and log operations. I get perforation depths from exploration or production department and coordinate everything until put the well on production. Work string design, production string design, workover fluid selection, perforation type selection, stimulation type selection, acid type, acid volume, acid pressure, swabbing, packers and all down hole tools about completion operations. We are using Halliburton, BJ, Baker, NOV equipment.
Eductation
ISTANBUL TECHNICAL UNIVERSITY
Certification
CEMENTING
STIMULATION
SHALE GAS
COMPLETIONS AND WORKOVERS
WORKOVER FLUIDS
Additional Information
Now I am manager of well completion department of Turkish Petroleum Corporation in Turkey. My team is total 151 crew. 12-petroleum engineer, 3-mechanical engineer, 9-logging engineer, 5-electronic engineer and 122 other crew. My company ‘’ Turkish Petroleum Corporation (TPAO)’’ has own drilling rigs(NOV, DM-1500, F-200, F-320), workover rigs(NOV 5C, NOV 4C, Ideco, IRI, Cooper), logging truck and systems(Halliburton), VSP and check shot equipment and truck, fishing equipments(BOWEN, NOV), Power swivels (BOWEN), Mud Pumps (Gardner Denver)….. We can do nearly everything ourselves. Only we are using sub contractor for directional drilling and gyro services.
I am managing all well completion and workover operations in my district. I get perforation depths from exploration or production department and coordinate everything until put the well on production. I make programs about work string design, production string design, workover fluid selection, perforation type selection, stimulation type selection, acid type, acid volume, acid pressure, swabbing, packers and all down hole tools about completion operations.
I have very good experience about field operations and working with other disciplines (reservoir, drilling, production, petrophysics).
Hot Categories
Chemicals
Batteries