Hvac technician
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 15 years
Relocation: Yes - Internationally
Career Objective
Obtain a position at your company where I can maximize my aptitude/skills, and training experiences.
Professional Experience
Jurong Shipyard Pte. Limited
Singapore
HVAC – R Technician
October 2005 - July 2012
Hokei Subic Corporation
Subic Bay Freeport Zone, Philippines
Technical Service
July 1996 – October 2005
Eductation
Refrigeration and Air-conditioning Technology
Central Luzon Institute of Technology
Olongapo City
March 1995
Electronics Technology
Central Luzon Institute of Technology
Olongapo City
March 1999
Certification
Executive IT Package
Informatics Computer Institute Philippines
June 19, 2004
Risk Assessment Course
Risk Management Course
Shipyard Supervisor Safety Course
HVAC In House Training Course
Occupational First Aider Course
ISO 9001:2008 Internal Auditor Course
Working At Height Course for Supervisors
OSHAS 18001:2007 Internal Auditor Course
Additional Information
• Routine checks on ductworks, dampers, air handling unit( ahu ), condensing unit (acu), ventilation fans, chiller plants and Refrigeration plants and relevant equipment to minimize rectification works requires in commissioning stage.
• All HVAC related equipment to be checked for proper preservation and possible damage so as to expedite in system commissioning.
• Prepare HVAC test packages as predefined boundaries.
• Perform checking (electrical/mechanical) on ventilation fan motor rotation (e-fan, s-fan), centrifugal pumps & water pumps, dampers (manually driven or pneumatic driven) that are ready prior to commissioning of system.
• Conduct/Assist in pre-commissioning and commissioning of HVAC system as requires. Includes analysis/trouble shooting upon system failure. And conduct immediate solution if found necessary.
• Arranged manpower for system pre commissioning such as system piping pressure testing and pipe flushing to expedite commissioning.
• Perform damper stroke testing upon flushing of tubing is obtained.
Hot Categories
Chemicals
Batteries