To obtain a challenging and demanding job in mechanical construction/commissioning combined cycle , gas turbine power plants that will further enhance my knowledge and skills
Professional Experience
Senior mechanical engineer. Kharafi national company (closed) -KUWAIT, Kuwait, safat, Apr 2010 - Aug 2012
2000MW SABBYIA combined cycle project mechanical construction & commissioning engineer
• construction for (6) gas turbine units with auxiliaries.
• start up tests (over speed , first firing, rotating equipment function tests).
• project drawings reviewing (P&ID)- general arrangement-equipments data sheets and complying it with contract requirements and specifications.
• contracts reviewing.
Mechanical engineer. Upper Egypt Electricity Production Company(UEEPC) –
750 MW Korymat combined cycle plant, Egypt, Giza, Dec 2004 - Apr 2010
Gas turbine maintenance engineer frame (GE MS 9001 FA) and Siemens V94.3A2
Duties : services and maintenance works for gas turbine units including routine maintenance , combustion inspection Hot gas path inspection.
• 627 MW steam turbine overall maintenance.
• water and waste water treatment construction engineer construction and commissioning for water treatment plants include primary filtration system , demineralized water production system plant waste water treatment system , oily water treatment system , and potable water system.
• water treatment contract and drawing reviewing , punch list preparing ,operation maintenance manuals reviewing, spare parts lists preparing.
• Gas turbine construction for 2*250 MW - Siemens V94.3A2.
• Technical office engineer
Eductation
Cairo university -Egypt, Master, Gas turbine power plants, Dec 2009 - Present
Thermo economic analysis of inlet cooling in gas turbine plants
Helwan university, Bachelor, Mechanical power engineering, Sep 1997 - May 2001
Project : combined cycle power plants degree :excellent general grade :good (72%)