Egypt Zones accountACCOUNT

Project Manager \ Project Planner


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 2
Experience: 5 years
Relocation: Yes - Domestically

Industry Experience
2 years Engineering Management
3 years Field Engineer

Career Objective

Seeking a more workshop experience to improve and enhance my academic background and increase my experience,My interests are mainly in management , Planning and different mechanical engineering techniques.

Professional Experience

1- Period : From 8/12/2010 till now.
2- Project : Extension of Idfena water treatment plant.
3- Position : Project Manager Assistant.
4- Company : Badr constructions Co..
5- Duties : Execute the electromechanical & instrumentation works.


1- Period : From 25/12/2009 up to 1/6/2010.
2- Project : BOG De-superheater at LNG - Damietta.
3- Position : Technical office & planning Engineer.
4- Company : PPC (Power Plant & Control).
5- Duties : a) Follow up the daily work activities for Civil ,
Piping , Pipe supports , Steel structure , Electrical
Works.
b) Work as QC (Quality Control) for electrical works.
c) Work as a planning Engineer.


1- Period : From 26/2/2009 up to 20/12/2009.
2- Position : Technical office and planning Engineer at main office.
3- Company : PPC (Power Plant & Control).
4- Duties : Studying tenders technically & making a full plan
and schedules for each project.


1- Period : From 18/2/2008 up to 23/2/2009.
2- Project : Salam site gas train 3&4 in Khalda Petroleum Company.
3- Position : Construction Engineer.
4- Company : PPC (Power Plant & Control).
5- Duties : a) Review all drawings & documents and check if it
agree with the actual site conditions.
b) Install all high & low voltage panels, distribution
boards, junction boxes & transformers.
c) Laying all electrical cables (LV & MV).
d) Install all cable ways for electrical cables.
e) Execute the cathodic protection system.
f) Execute the heat tracing system for piping.
g) Execute the lighting system.

Eductation

* Graduated from El Nasr Boys School (E.B.S),"secondary school certificate" with an overall grade of 87% (2001).

* Awarded bachelor degree in "Mechanical Engineering" from the department of mechanical engineering, college of engineering and technology, Arab Academy for Science and Technology (AAST) in September 2007 with a grade "very good" (GPA 2.84).

* Undertook research as part of graduation thesis in strain gauges "with a practical design and assembly of an experimental rig to a load cell for measurement of stresses due to compression, with a grade "Excellent".


Certification

* Awarded bachelor degree in "Mechanical Engineering" from the department of mechanical engineering, college of engineering and technology, Arab Academy for Science and Technology (AAST) in September 2007 with a grade "very good" (GPA 2.84).

* Three months training in PPC (Power Plant and Control) company at the LNG project in Damietta, it was while constructing the train one, this train where the natural gas takes its cycle to be liquefied.

* Successfully completion of Total Quality Management 2008-2009.

* Successfully completion of Negotiation skills 2009.

* Successfully completion of Primavera Project Management V.6.

* Successfully completion of Project Management professional (PMP) at May 2011.

* Successfully completion of International Project Management Association (IPMA) at July 2012.

Additional Information

Self-Studies:

* Decision Making.
* Solving Problems.
* Time Management.
* Communication Skills.
* Quality Assurance.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News » Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.