Mechanical Engineering Graduate with Experience in QUALITY CONTROL in the Field of Heavy Fabrication of Pressure Vessels, Piping, Boiler Auxiliaries.


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 2 years
Relocation: Yes - Internationally

Industry Experience
2 years Quality Control/Quality Assurance Engineer

Career Objective

To Obtain a Position in the field of Quality Control, that will enable me to Expose My Strong Organizational Skills, Techniques in the areas of Heavy fabrication,and ability to Work well with People for the Growth of the firm.

Professional Experience

M/s. CETHAR LIMITED - Engineer in the Department of Manufacturing Service looking Over Quality Control & Assurance, Handling of projects with all Documentation in the field of Fabrication of Pressure parts and Non pressure Components, which includes Boiler Auxiliaries, Ferrous and Non Ferrous, Alloy steel components, Sheet Metal Works and power plant Components.
Quality Inspector in the Fabrication of Pressure Parts and other Steel Components includes Steam Drum, Storage Tanks & other Pressure vessels, Piping, Boiler Auxiliaries for Various Stages from its Raw Material to Final Dispatch stage as Per ASME Sections & Standards.
Welding Techniques are applied for all types of Materials Such as Carbon Steel, Alloy Steel by the Development of WPS, Weld Matrix, and Weld Map by enabling the job to be free from Weld Defects.
Process Parameters are followed for All Activities involved in the Fabrication of Pressure Vessels and it is being followed by maintaining Process Monitoring Sheet for each Work Content.
Coordinating the Customers and Third Party Agencies for the Concerned Stages of Fabrication as per Customer Quality Plan (CQP) and Quality documents for all projects, thereby the Certification of Conformance (COC) is being ensured.
All Gas cutting Edges, Gouched Areas are being inspected for PT (Penetrant Test) and Full welding areas are subjected to MT (Magnetic Particles Test).
Proper Visual inspections are done for Welding, fillet areas to avoid Stress concentrations, Aesthetic views are being developed in the final stage before dispatching for shipping.
Preparation of Inspection Test Plan (ITP) for Various Projects as per Standard Quality plan of the Product in coordinate with Customer and other TPI agency.
Documentation for Pressure Part Components for Entering the Dimensions in all stages are Maintained in the form of History Cards and For Non pressure Parts Dimension Record (DR) book is being followed.
Ensuring Quality in all Stages for Production to ensure the conformance of Manufactures Products, Bought outs and field assembly of Power Equipment to the applicable Codes, Engineering Requirements & Customer Specifications.
Third Party Such as LRA (Lloyd’s Register Asia), TPL (Tata Projects Limited), QUEST are Coordinated for Stages of Inspection.


Eductation

B.E. MECHANICAL ENGINEERING
ANNA UNIVERSITY - CHENNAI
Passed out in MAY - 2010
I Class With Distinction with Overall of 77%

Certification

ASNT LEVEL II in PT,MT,RT,UT from NDE INSPECTIONS - Thiruchirapalli.

Additional Information

Steam Drums, Panels, Piping for Various Utility Projects for Units of 350 MW are being fabricated and Inspected for Customers M/s. Ind Bharath, M/s. Meenakshi Power, M/s. SKS Ispat, Such PC Fired Boiler Drums weighs about 225 Tons.
Boiler Drums and Storage Tanks for other Utility Projects Such as M/s. Vandhana Vidhyut, M/s. Jai Prakash Industries, M/s. Jeypee Sidhi Cements, M/s. Aryan Coal, and M/s. Shree Mega Power are Successfully Completed from its Raw material to dispatch Stage.
More than 20 Projects of IB/CPP Boilers for Various products Includes Steam Drum, Deaerator Storage Tanks, Water Wall Panels, Headers, Piping, Economizers, and Super Heater coils are handled and Successfully Completed.
ASME coded Steam Drums for Customers M/s. Dangote Industries, M/s. Shantha Steels are Constructed and dispatched Under TPI (Third Party Inspection) LLOYD’S Register Asia by Authorized Inspector (AI).
Steam Drum and Piping for METSO Power Projects such as M/s. Grasim Industries, M/s. Kohinoor paper and pulp, M/s. Harihar polyfibres are completed under METSO Inspection from Material Clearance to Final Dimensions.
Boiler Drum, Mud Drum for Various Projects are fabricated for BHEL, one of the Leading Boiler Company across World Wide, under their Inspecting Process.
Looking Over Furnaces of Weighing Capacity 250 Ton and 50 Ton for Various Cycles Such as Stress Relieving, Normalizing – Tempering, Solution Annealing.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Hydrostatic Testing » News » Inspection » News » Laboratory Services » News » Non Destructive Testing » News » Testing » News » Testing & Inspection Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.