Egypt Zones accountACCOUNT

Electrical Technician


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 1
Experience: 8 years
Relocation: Yes - Internationally

Industry Experience
8 years Electrician

Career Objective

I am looking forward to do my experience and knowledge in a company that would allow me to gain experience, develop my skills and fulfill the organizational objectives.

Professional Experience



1) Routine Inspection like as Preventive Maintenance(PM), Corrective Maintenance (CM) and Reactive Maintenance (RM) of electrical equipment and the system

2) Provide technical guidance and advice in area of specialization ( UPS system, Synchronous motor and Excitation, Purging system for Hazardous equipment, and Desalter (conventional and EDD ) with respect to trouble shooting, problem diagnostics, and benchmarking

3) Provide technical solutions to issues / potential problems, related to reliability/integrity improvement, and bad actor resolution.

4) Checking and Trouble Shooting of Electrical Faults and failure especially on UPS system, LV and HV Motor, LV and HV switchgear, Generator and Desalter.

5) Servicing and Overhaul motor below then 5.9 MW brand ABB, Simen, Loher, Toshiba, Fuji, and Weg for bearing replacement, Gasket replacement, labyrinth seal replacement and lube oil replacement.

6) Troubleshooting and servicing Purging system for Ex p motor especially model 4XLC, 6XLC, 2 XLC, 3XLC ,6PP and D258 for Exp and ExNe motor brand Expo

7) Troubleshooting and servicing Motor control compartment (MCC) 415V,6.6KV and 11KV brand Tamco for 6.6KV, Merlin Gerin for 11KV and SI for 415V

8) Servicing and troubleshooting protection system MM2,Sepam 2000, Sepam 80, feeder management 750,REF 542 plus, ENMCS system, ECS system and IMCS system brand ABB and Schneider

9) Manage, servicing and troubleshooting on AC and DC UPS System including discharge test, resistance test the battery for UPS system and to make sure system in good condition and available to be use when emergency power failure to backup vital and essential load like DCS, SGS, TGS. Brand of UPS system like as Gutor, Chloride, AEG, safe power, Benning, and Merlin Gerin

10) Service and troubleshooting MOV system like as overhaul to replaced drive bush, replaced lube oil, replaced controller card, and replace motor. Model of MOV are A Range,IQ range and IQ Mark 2. Brand of MOV are Rotork

11) Troubleshooting and service plan Lighting and socket outlet like as replace new fitting, troubleshooting when circuit trip, replaced bulb, and replaced internal compartment lighting and socket outlet. Brand lighting and socket outlet are CEAG and AEG



Eductation

January 2003
 Institute Technology Petroleum PETRONAS (INSTEP)

• Oil and Gas Technical Training Programmed (OGTTP)
• Electrical trade
• Sponsored by EDUCATION DIVISION KLCC
• Diploma in Electrical Petrochemical Engineering

Mach 2000 – December 2002
 Sekolah Menengah Teknik Kuala Krai

• Sijil Pelajaran Malaysia (SPM)


January 1998 – Mach 2000
 Sek. Men. Ugama ( Arab ) Mahaad Muhammadi ( Lelaki )

• Peperiksaan Menengah Rendah ( PMR )


Certification


•Competent or Chargeman level A1
•Proficient in Microsoft Word, Excel, Power Point and Auto – Cad 2004 and 2003
•Specialist in UPS and MOV ( motor operated valve) system
•Knowladge and good experience in SAP system version SAP 6.2

Additional Information

Host Company : MRC/Petronas Penapisan Melaka Sdn Bhd
Duration : June 2007 – June 2008
Position : Site coordinator
Department : PSR2 REVAMP Project Department

This was the project awarded to Consortium of Foster Wheeler Malaysia (E&C) Sdn. Bhd and PFCE Engineering Sdn. Bhd. on the proposed construction of PSR2 project at Melaka for Petronas Refinery (Melaka) Sdn. Bhd.

The Roles include

1) Schedule planning monitoring.

1a) During Engineering and Procurement stage - for Engineering, monitoring the progress of drawing preparation and their status, either prepared. They were including, Basic Engineering, Equipment and Mechanical, Electrical, Civil Piping drawings.

1b) Construction stage - monitoring the progress of field construction activities, which namely Civil work, Equipment installation work, Structure and Piping fabrication and erection, Building, Instrumentation, Electrical, insulation and Painting works.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
Contracting Services » News » Dredging » News » Electrical » News » Mechanical » News » Pipe Lines Installations » News » Steel Works » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.