Curriculum Vitae or Jean de Villiers
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 14 years
Relocation: Yes - Internationally
Career Objective
To optain a job in the international Oil and gas industry
Professional Experience
Elecnitron cc E&I Technician & Project Manager 2007-Current
E&I project manager and team leader; overseeing installation, calibration and maintenance projects in the heavy industrial, gas, steel making and raw materials handling industries.
Key responsibilities:
Overseeing Honeywell gas detector (H2, CO and SO2) service and calibration contract at ArcelorMittal.
Maintenance and standby contract at Afrox Hydrogen, LP Gas and PSA (Nitrogen) plants in and around the Saldanha Bay area. (Intrinsic safety environments H2 and LP-Gas)
Algas and Ely gas vaporiser units (8 ton LPG per Hour units)
Maintenance contract on four 1M Watt Oxyfuel ladle heater burners at Tronox pig iron caster plant.
Hands-on setting up, programming and calibration of new instruments, PLCs positioners and drives
Electrical fault-finding expert on maintenance projects.
Commissioning and testing, compiling of compliance certificates and signing-off of projects
Direct and manage project development from beginning to end.
Estimate the resources and participants needed to achieve project goals
Define project scope, goals and deliverables that support business goals
Effectively communicate project expectations to team members and clients
Develop quality control plans, HIRAs Risk profiles and environmental impacts for each project
Identify and resolve issues and conflicts within the project team.
Afrox (Linde Group) Maintenance Millwright 2005 to 2007
I held the maintenance millwright position at Afrox Duferco site, were I was in charge of an 500 kW Hydrogen Plant, four 350Nm³/h Nitrogen PSA plants and a 300ton LPG storage and vaporizer unit.
Key Responsibilities:
Ensuring the plants ran with as little down time as possible
Day to day operation, plant checks and breakdowns (Electrical and Mechanical)
Scheduling and executing of shutdowns and preventative maintenance plans
Ensuring all safety aspect was in place and up to date.
Managing of spares and equipment.
Electrical, instrumentation and LP-Gas compliancy tests.
Managing records and file system.
Achievements:
I made a design change to the cooling water system of the Duferco Hydrogen plant that reduces downtime on the plant by approximately 12 hours per month.
Eductation
Installation Rules (Wiremans Licence) National Certificate 2010
Testing and inspection of single phase Installations E-SETA 2009
LP Gas installers code LPG South Africa 2007
Millwright Trade Test Westlake Collage 1999
N5 Industrial Electronics & Mathematics WP Technical Collage 1996
N4 Mechanical & Electro Techniques Newcastle Tech 1996
S1 Electrical Engineering (Low Current) Cape Tech 1994
Microsoft Systems Engineer NT4 Track Damelin 2000
Network + Damelin 2000
A+ (International Exam) CompTIA 2000
School (Grade 12) Drostdy Technical High School 1993
Certification
First Aid level 2
Permit to work (ArcelorMittal, Petro SA, Afrox and Exxaro.)
Confined space entry
Advance fire fighting
Working at heights
Drδger advance breathing apparatus training
AC10 overhead crane control systems
ABB advant OCP operator training
Advance occupational health and safety.
Infra red thermal camera training.
Hot Categories
Chemicals
Batteries