Instrument Technician
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 7 years
Relocation: No
Career Objective
Experienced in the filed of Instrumentation Dealing with instrument Installation, Calibration Loop checking, Termination and Pre-commissioning, Handle P&ID Instrument Index, Loop Diagrams, I/O list, Internal Terminal Block Checking.
Professional Experience
(Over all Experience 07 Years)
Currently I am Working In GATRON INDUSTRIES In Department Of E/I Polycon.
1) Position: Electrical / Instrument Supervisor
Employer: PAKITEX Glue Plat / FA
Duration: From Jun 2009 to Aug 2011.
2) Position: Instrument Supervisor
Employer: Metal Engineering Complex
Project: White Oil pipeline project of PARCO Ps. Station # 1
Duration: From Jan 2008 to April 2009.
3) Position: Instrument Foreman
Employer: Siemens Engineering Construction.
Project: DHA Power & Desalination Plant.
Duration: From Oct 2006 to Dec 2007.
4) Position: Instrument Technician
Employer: Systematic Engineering Services
Project: Pakistan State Oil (PSO) worked on Installation & Commissioning of Radar Type level Transmitters for storage tanks in different cities of Pakistan.
Duration: From Nov 2003 to May 2006.
Eductation
B-Tech Pass (Electronics) Indus Institute of Higher Education (2008)
Three years Diploma of Associate Engineering in (Electronics) from Sindh Board of Technical Education Karachi. (2003)
Matriculation from Sindh Board of Technical Education karachi. (2000)
Certification
1) Position: Electrical / Instrument Supervisor
Employer: PAKITEX Glue Plat / FA
Duration: From Jun 2009 to Aug 2011.
2) Position: Instrument Supervisor
Employer: Metal Engineering Complex
Project: White Oil pipeline project of PARCO Ps. Station # 1
Duration: From Jan 2008 to April 2009.
3) Position: Instrument Foreman
Employer: Siemens Engineering Construction.
Project: DHA Power & Desalination Plant.
Duration: From Oct 2006 to Dec 2007.
4) Position: Instrument Technician
Employer: Systematic Engineering Services
Project: Pakistan State Oil (PSO) worked on Installation & Commissioning of Radar Type level Transmitters for storage tanks in different cities of Pakistan.
Duration: From Nov 2003 to May 2006.
Hot Categories
Chemicals
Batteries