Piping Designer/Draftsman
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 8 years
Relocation: Yes - Internationally
Industry Experience |
8 years |
|
Other |
Career Objective
I am now looking forward to built on my extensive range of AutoCAD Piping Designer and Drafter within a suitably challenging role. I am keen to achieve further professional development.
Professional Experience
CH2M HILL / VECO Engineering
Abu Dhabi, UAE
Piping Draftsman
July 2006 – October 2012
• Petronas (Project-426122)
Water Intake Station (WIS) Garraf Operation Iraq
Involved in preparing of Plot Plan, Equipment Key Plan, Equipment Layout, Piping Layout and Isometrics.
• Missan Oil Field Development (Project-19139)
Oily Water Treatment AGS1, BUT, FQN, FQS Area and
Water Injection Station
Involved in preparing of Manual Piping MTO.
• GASCO (Project-438415)
Feed for Supply Gas to TAKREER NORM Project at BeAAT
Ruwais
Involved in preparing of Piping Plot Plan, Key Plan, Layout, Details and MTO.
• ADCO (Project-426130)
BAB Habshan 1 Development Project Feed
Involved in preparing of Alignment Sheet for 8” Water Injection Header Line and Flow Line.
• AHDEB (Project-401910)
Oil Field Surface Facilities Development Project
Involved in preparing Open and Closed Drain network layout CPF, piping layout, isometric and detailed drawings.
• Algeria (Project-20303)
Potable Water Supply to Tamanrasset City in Salah,
Lot no. 2 Pump Station.
Involved in preparing above and underground piping layout, isometric and detailed drawings in areas SP3, SP5 and SP6.
• ADMA-OPCO (Project-20278)
Replacement of Burried Pipework in Storex Area
Involved in preparing model, piping layout, isometric using Isogen, detailed drawings and extraction of MTO.
• GASCO (Project-20253)
Habshan Sulphur Recovery Project
Involved in preparing model, piping layout, isometric, detailed drawings and extraction of MTO.
• GOGAS (Project-20284)
Chloride Guard Bed for Unit Ruwais Refinery
Involved in preparing piping layouts.
• MOL (Project-20271)
Manzalai Field Development Surface Facilities
Involved in preparing piping layouts.
• GASCO (Project-20254)
Replacement of NGL Pipeline Network (ASAB-BAB Scraper Receiver)
Involved in preparation P&ID and PFD drawings.
• PETRODAR OPERATING COMPANY LIMITED
(December 2003-February 2004)
Involved in preparation P&ID and PFD Bid drawings for the following area; Palogue FPF/CPF/FSF, Adar and Agordeed FPF/FSF and Al-Jabalyn CPF.
Eductation
University of Batangas
Drafting-CADD
June 1995-1997
LEMEHI High School
June 1991-1995
R. Venturanza Central Elementary School
June 1986-1991
Certification
AutoCAD Release 14
Lemery Computer Colleges
Lemery, Batangas, Philippines August-1997
Micro Station SE
Lemery Computer Colleges
Lemery, Batangas, Philippines April-2000
Smart Plant 3D (SP3D)
CH2M Hill/VECO Engineering
Abu Dhabi, UAE, January 2012
Additional Information
Profile
Strong team player, fast learner, hard working, efficient & effective, accepts direction easily and willing to invest time and effort to complete a certain responsibility, & take pride in high quality work produced.
Level of Experience
8 Years Experience in Oil & Gas Piping Draftsman
2 Years Experience in Architectural Draftsman
Fields of Experience
Knowledge in Smart Plant 3D Design, AutoCAD, Microstation, Pro-CAD, 3D Modeling using CADWorx for Auto CAD and Quick-Pipe for Microstation, Preparing design for Piping Layout, Isometric and prepares MTO.
Hot Categories
Chemicals
Batteries