Petroleum Engineer With 5 years Experiance
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
To become a highly competent engineering professional, who can take up and execute Challenging project efficiently and be an asset to the organization in terms of growth and productivity.
Professional Experience
Wire Line Logging & Perforation:-
•Implement wire line open-hole & cased-hole logging to operating company at well site location including logs processing and analysis (Quantitative & Qualitative).
•Responsible for winch control (Artex), Rig up and down, equipment preparation, calibration and utilization at well site.
•Implement wire line Perforation by using Scallop gun including gun loading, testing and handling of misfired guns.
Drilling:-
As Trainee Drilling Engineer (Core well and Production well) was responsible to:-
•Administer Drilling operation along with design of wells, Drilling Programs and monitor the work of the Drilling crew on site.
•Monitoring of safety procedures and ensure the maintenance of the well.
Eductation
University of Petroleum and Energy Studies, Dehradun May 2008
Bachelors of technology in Gas/Petroleum Engineering with 3.19 CGPA
Certification
•Successfully completed a course on Safety in Logging Operations from IPSHEM(Institute Of Petroleum Safety, Health & Environment) Goa, ONGC
•Certify to perform Perforating job (CBM) as a Perforating Engineer.
•Successfully completed training on Operating RG Logging tools and Data Processing under Filip Jankovsky (Logging Engineer, Robertson Geologging Ltd.)
•Successfully completed industrial automation training on SCADA and PLC at Sofcon India Ltd (Noida).
Additional Information
Projects Undertaken:-
•Worked on Oil and Gas well testing and its interpretation as a major project.
•Worked on “Gas well Testing (Pressure build up test) under Reservoir Department of ONGC at Rajahmundry Asset/ K G Basin as a part of industrial training.
•Worked on Artificial lift system (Sucker rod pump, Gas lift method) under Production Department of ONGC at Rajahmundry Asset/ K G Basin as a part of industrial training.
Hot Categories
Chemicals
Batteries