Shift Engineer in Power Plant including Gas turbines, Steam turbines, Engines
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 11 years
Relocation: Yes - Internationally
Career Objective
Attaining a challenging position in the industry that will enable me to use my strong professional and managerial skills, educational background and ability to work well with people to accomplish corporate objectives of the organization.
Professional Experience
QATAR ELECTRICITY &WATER COMPANY [RAF STATION Doha, Qatar]
[July 2011-TO DATE as SHIFT Engineer]
Presently I am working as a Shift Engineer in Qatar Electricity & Water Company [QEWC], a 2200 MW Power and 178 MIGD Sea water Desalination, combined cycle Power Plant located at Doha, Qatar.
Currently my assignment is Ras Abu Fontas-B Generation Island. The RAF-B Generation Island consists of:
o 03 Gas Turbine units of GE -9FA-216.2 MW at 50°c with control System ‘Speed-tronic Mark-VI’ and associated WHRB [NOOIER/ERIKSEN-560 Tph, 27 bar drum pressure & 240°C temp.]
o 08 Gas Turbine units of ABB/ Alstom [ABB 13E2-164.3 MW] / [Alstom 13E2-161MW] with control System Eagatrol-P/ ADVENT Power- Control and associated WHRB [ABB-329 Tph, 15 bar drum pressure & 200°C temp.]
KAPCO (KOT ADDU POWER COMPANY
[September 2008- June 2011 as SHIFT OPERATIONS ENGINEER]
1600MW combined cycle power plant with three blocks.
Block-I: Two M/S Siemens Gas turbines V94.2 each with rated capacity of 143.8 MW on gas at 15°C, one Siemens steam turbine with rated capacity of 148.6 MW.
Block-II: Four Frame 9 (Type 9001 E) M/S Alsthom France Gas turbines each with rated capacity of 94.65 MW on FO at 15°C, two single cylinder Rateau France steam turbines with rated capacity of 103.4 MW.
My assignment was at 2 x (2+1) 600 MW GEC ALSTHOM Block-II having four (04) Gas Turbines {Model: MS9001E, Make: ALSTHOM France, Control system: Speed tronic Mark-IV, Each having 100 MW capacity} and two (02) steam turbines {Model: VEGA 209 110B, Make: RATEU France, Each having 100 MW capacity}
• Chashma Nuclear Power Plant-Pakistan CHASNUPP
[April 2003- August 2008 as SHIFT OPERATIONS ENGINEER]
CHASNUPP is a 325MW PWR [Pressurized water reactor] power plant {325MW Westinghouse Steam turbine one HP and two LP cylinders with MSR (Moisture separator and reheater)}. I worked there as Electrical Operation engineer, Turbine Operations Engineer and Reactor operations Engineer in Main control room and supervised local area plant operators of respective post as well as handled transients and emergencies at plant.
CHASHNUPP CENTRE OF NUCLEAR TRAINING [CHASCENT]
[April 2002- April 2003]
One year postgraduate training from CHASCENT in Nuclear steam Power Plant Technology.
Eductation
B.SC (Mechanical Engineering) 1997-2001 University of Engineering and Technology, TAXILA, Pakistan
Additional Information
SOME IMPORTANT TRAINING ATTENDED:
Strategic Time Management By Time lenders
Quality Management system ISO-9001:2008 by SGS
Environmental Management system ISO-14001:2004 by SGS
SKILLS
Strong communication skills
Team management skills
Technical writing skills
Leadership skills, team player and time management skills
COMPUTER SKILLS
MS Office
Microsoft Windows 2000, XP & Windows-7 with Enhanced capability to operate internet.
Q4CAMM Defect card and maintenance Software
LOTUS Oracle Based Electronic Permit & Defect Card system
Hot Categories
Chemicals
Batteries