Employment with a progressive company wherein my educational and experience credentials can best utilized, while gaining the same and be good assets to this company offering a challenging opportunity and professionalism.
Professional Experience
QA/QC Inspector
March 2011 - Present
Carlo Gavazzi Arabia Bonatti Group of Companies
Jeddah, Saudi Arabia
Projects:
1.Independent Water Power Plant (IWPP) Shuaiba Jeddah KSA
2.Technip Italy (Jubail Export Refinery Project) package 5A
Duties and Responsibilities
3.Initiates RFI ( Request for Inspection) after verification of required inspection.
4.Conducting complete inspection for loop checking, wiring continuity, color coding, IR test, HI-POT test, start up, and troubleshooting if required.
5.Responsible for the implementation of Quality Procedures.
6.Monitors daily activities, checks and assures the all activities is in compliance with standards and specification
7.Initiates RFI (Request for Inspection) after verification of the required inspection.
8.Notifies construction supervisor and manager on the corrective action (CA) that has been taken.
9.Verifies the calibration of visual inspection aids if required and also the measuring and testing equipment.
10.Conducts surveillance audits and report to QA/QC supervisor.
11.Responsible for the submittal of all QC documentation.
Eductation
College : Bataan Peninsula State University
Bachelor of Science in Electrical Engineering (BSEE)
(SY: 2004 - 2009)
Secondary : Bonifacio Camacho National High School
(SY: 2000 - 2004)
Elementary : Tuyo Elementary School
(SY: 1995 - 2000)
Certification
Best Behavior on site champion – January 2012 Given by Technip Saudi Arabia
Autocad 2010 with color rendering – Dec. 2009 by Microcadd SM City, Pampanga
PEC, REQUIREMENTS FOR ELECTRICAL INSTALLATION – Nov. 2007
by Bataan Peninsula State University
Power World Simulator – Feb. 2008
by Peninsula Electric Cooperative, Inc.
Procedures in Synchronizing Generating Sets in Parallel / Hans on Low Voltage Circuit Breaker Testing – by IIEE EATERN REGION CHAPTER, SAUDI ARABIA
Progammable Logic Controllers (level 1)/ Assembling, wiring, Testing Operating an Auto /transfer Switch –
by IIEE EATERN REGION CHAPTER, SAUDI ARABIA