ELECTRICAL ENGINEER WITH 8 YEARS OVERSEAS EXP
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
I WORKED AS A ELECTRICAL ENGINEER IN ERECTION, INSTALLATION, COMMISSIONING & TESTING OF 132KV SUBSTSTION IN OIL & GAS INDUSTRY
Professional Experience
• Involved in installation and commissioning of new electrical equipment, such as 132/11Kv switchgears, 132/11Kv Transformers, LV switchgear, MCC s. Also, involved in, refurbication of existing switchgears and connecting to the new DCS system.
• Study & approval of engineering drawings and technical submittals carried out.
• Involved in the planning and scheduling of the project work.
• Installation and commissioning of Fire alarm system and FM200.
• Installation and commissioning of 36 KVA UPS and battery chargers.
• Installation and commissioning of 3.3Kv Generator with load banks.
• Installation and commissioning of cathodic protection system.
• Installation and commissioning of Public address system, CCTV, BMS,SMS and HVAC system.
• Installation and commissioning of all kind of MOV s including IQ series.
• Installation and commissioning of Photo voltaic systems 640 WP.
• Conducts routine follow-up of construction activities associated with ongoing projects.
• Preparing project implementation schedule for all phases.
• Assumes full responsibility for the role as envisaged by Health, Safety and Environment (HSE).
• Preparation of Project Schedules for the subcontractors and checking the daily progress of the wok.
• Preparation of final test reports and commissioning reports and necessary commissioning documents for the system commissioned.
• Handling of team of work force, for speedy completion of the project as required.
• Complete knowledge of the classification of the explosive zones.
• Knowledge in testing and commissioning of all kinds of protection relays.
• Prepared test protocols and commissioning reports.
• Operation and maintenance of 110/11Kv Power transformers in intake substations carried out in periodical manner.
• Maintenance of 11Kv Switchgears and control panels.
Eductation
BE(ELECTRICAL & ELECTRONICS ENGINEERING)
MBA(PROJECT MANAGEMENT)