site engineer mechanical, having three year experience in oil and gas as well as power plant construction
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
To obtain a position in an intellectually motivating environment and to use my skills for the benefit and success of the organization and enhance my knowledge so as to evolve into a dedicated, hard working professional.
Professional Experience
•Having Three year exclusive experience in the field of oil and gas as well as Power plant construction.
• worked as junior engineer with GALFAR ENGINEERING & CONTRACTING WLL EMIRATES for ASAB full field development oil and gas project.(REF 7054)
•Worked as piping engineer with universal erectors PVT LTD for 2x660MW ADANI POWER PLANT MUNDRA , SEPCO
•Worked as site engineer with soumya engineering& co for 1x330 MW ADANIPOWER PLANT, SFPML
Eductation
B-Tech in mechanical engineering from SREE CHITRA THIRUNAL College of Engineering, Trivandrum,
Kerala University 2009
(2005-2009)
Higher Secondary Examination C.B.H.S.S VALLIKKUNNU.
Malappuram
Board of IGHER Secondary Education
Kerala (2002-2004)
Secondary School Leaving Certificate
(SSLC) G.M.H.S.S Calicut
University Board of Secondary Education
Kerala
2002
Additional Information
•Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary
•Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.
•Develop Construction Engineering Technology in line with Company Policy and Procedures
•Elaborates construction feasibility analysis evaluating available materials & drawings.
•Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings
•Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.
•Assist Design Department in solving Piping Modification and Technical Problems in the Field
•Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness.
•Carrying out final P&ID check of installed piping systems in the module along with client..
•Preparation of “AS BUILT” drawings.
•Responsible for carrying out Mechanical Clearance,
•Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.