ARUNA KUMAR_Resume
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
A dynamic professional with over 2.8 years of rich experience in Service Operations, Maintenance, Troubleshooting, Shift In charge, Technical support and Team Management.Now working in Srilanka,
Professional Experience
Operating and maintaining the wind power plant for maximizing productivity while adhering to quality regulation.
Commissioning of the new wind energy converters, transformers and transmission line.
Hands on experience in man power and site management.
Recording and preparing daily generation report for import & export for Active & Reactive power.
Executing maintenance, design up gradations, etc. at respective sites.
Assisting the breakdown of wind energy converters & associated component.
Analyze the root cause of failure and preparation of documents about the failures.
Studying the chances for the improvement in the software for the better operation of the machine.
Carry out periodic training of O & M personal and encourage safe and good engineering practices.
Maintenance of documentation as per ISO, EHS, OHSAS, Updating of records with latest revised document.
Liaison with state electricity boards for grid related issues
Transformer, VCB, ACB, IGBT, Rectifier, etc Maintenance.
HT yard Maintenance.
Testing of modules.
PLC, SCADA, HMI maintenance.
Preparation of KAIZEN,Monthly Performance reports for Clients.
Knowledge about in Synchronous and Asynchronous Generators
Eductation
• Diploma from S.N.M POLYTECHNIC from Moodbidri (MANGLORE), with an aggregate 66.01% (2007-2010) (DEE).
• Pre-University Education (Science) from Govt Pre University College Shankaranarayana(UDUPI), with 56.6% (2006-2007).
Certification
Performed duty of Technical Shift In charge for Theni-Tamilnadu,INDIA Wind Power Plant of Regen Power Tech Pvt. Ltd., containing 83 nos. Wind Energy Converters with installed capacity of 124.5 MW.
Achieved target of Machines to Man ratio called MMR by 5 Mac/Man.
Attained maximum Technical availability of the Machine during high productive period up to 98%.
Co-ordinated with electricity board team for smooth operation of the site and Technical updating of machines with changes in the software and hardware Retrofitting.
2012th jan onwards working in Srilnka.
Additional Information
Operating Systems : Windows 9x, Windows XP, Windows 7 & Vista
Application Software : MS-Office, Accessing Internet, SAP,MAT lab with Simulink,
Crimpson Redlion for HMI programing
Programming / Trouble Shooting of PLC : Bechoff with and Without Optimization
Others : Advanced Electrical Equipments controlled by Microprocessor
Inverter cabinets using PWM technology up to 3000KW rating Over Head HV lines, Transformers / Circuit breakers,
Power Electronics AC Drives and DC Drives, Choppers, Inverters,
DCS and SCADA system : Knowledge in SCADA, like monitoring, control and data
Transfer applications.
Hot Categories
Chemicals
Batteries