Production Technologist or Completion & Workover Eng
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
To find a challenging position to meet my competencies, capabilities, skills, education and experience in an oil and gas industry
Professional Experience
Workover and completion Engineer, Greater Nile Petroleum Operating Company, Jan. 2010 – Present
• Responsible for designing workover programs including guidelines for the operations to be carried out.
• Monitors implementation of rigless and/or rig operations (Perforation, Production logging, Well testing, Sampling, and Wireline) at oil and water wells.
• Evaluate and select appropriate equipment to achieve workovre objectives.
• Estimate rig days and cost of workover job.
• Plan and optimize service rigs schedule.
• Attends meeting with contractors to evaluate their performance.
• Follows up the company safety, health and environmental policy.
Production Technologist, Greater Nile Petroleum Operating Company, August. 2008 - Jan. 2010
• Monitored oil production well on daily basis.
• Highlighted any production constrains and work with facilities to remove bottlenecks.
• Identified and evaluated production optimization opportunities (surface & sub surface).
• Identified Under performing wells.
• Monitored and optimized well testing schedule.
• Monitored AL well actual performance against AL well potential (Performance matching).
• Prepared ESP design and maintained a close work relationship with ESP vendors to ensure that assigned design carried out in the most efficient manner
• Trouble shooted well performance to recommend remedial action.
• Attended meeting with ESP vendors to evaluate their performance.
• Prepared PCP design and maintained a close work relationship with workover team to ensure that assigned design carried out in the most efficient manner.
• Participated in ESP and PCP troubleshooting activities to identify the root cause of pumps failures.
Eductation
17th -21st, Oct- 2010 Advance application & operation of ESP system
Alexandria, Egypt
20th -24th, Sep-2010 PCP application and design
Heglig, Sudan
December, 2009 Advance Production Logging Interpretation
Petrotrain Khartoum, Sudan
February, 2009 MS Office
APTECH Khartoum, Sudan
2000-2005 Bachelor of Science, Petroleum Engineering
Khartoum University, Sudan
Hot Categories
Chemicals
Batteries