Egypt Zones accountACCOUNT

process engineer - project site manager - pipeline engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 15 years
Relocation: Yes - Internationally

Industry Experience
4 years Engineering
6 years Consulting Engineer
5 years Construction Engineer

Career Objective

process engineer - oil and gas projects

Professional Experience

Professional Related Experience:

Jan. 2011 to Aug. 2012 :
- ASAS Contracting Ltd.
- Project Manager - North Al Hussin Gas Project –

Project Consisting of Gas Gathering Station – 6 Well Heads – 6 Flow Lines –
16" Gas Pipeline Length 28 KM & 8" Condensate Pipeline Length 22 km with Pumps
- Process and Piping Engineering .
- PFD & Design Basis and P&ID .
- Hydraulic Study and Sizing for Liquid and Gas Lines .
- Process Simulation for Gas and Condensate Pipelines on HYSYS 3.1
- Heat and Material Balance .

Jan. 2010 to Oct. 2010:
Engineering Company AGM –(Associated Group Management) :

Engineering and Consultancy Services for Upgrading Oudeh and Tishrine Oil & Gas Fields - OUDEH PETROLEUM COMPANY (Joint Venture Syrian Petroleum Company & SINOPEC China) .
- Process Engineering for Oudeh and Tishrine Oil Fields .
- PFD & Design Basis and P&ID .
- Hydraulic Study and Sizing for Liquid and Gas Lines .
- Process Simulation for Gas and Oil Pipelines on HYSYS 3.1 .
- Heat and Material Balance .

– Collection Station- Flow Lines and Track Unloading Pumps
– Separation – Oil Treating Tanks - Exports Pumps .
Bath Heaters , Electrical Heaters .

Sep. 2009 to Oct. 2009:
Gas Oil Technical Company:

Project Site Manager – Pre Commissioning - Commissioning and Start- Up for Jihar Project Stage – II –Gas Gathering and Processing Station- Hayan Petroleum Company (Joint Venture Syrian Petroleum Company & INA Nafta Croatia).

Aug. 2009 to Sep. 2009:
Gas Oil Technical Company:

Project Site Manager- Pre Commissioning - Commissioning and Start- up for 24” Syria – Lebanon Gas Pipeline and Metering Station & 10” Gas Pipeline From Metering Station to Power Station-
Ministry of Power – Lebanon .

Feb. 2009 to Apr. 2009:
Syrian Gas Company:

Project Site Manager of East Arak Project
-2 flow lines 6"and 2 well head skids & 8" pipeline 9 km
(Palmyra Gas Project - Syrian Gas Company) .

Oct. 2008 to Dec. 2008:
TECPESA-TBL : SPANISH COMPANY - HOT TAPPING PROJECT

Project Site Manager – Hot Tapping Project for 16" Jebbisa gas pipeline -in 8 locations.
8 spled tees 16" hot welding - 8 hot welds 4" – 16 hot welds 2"
8 hot tapping 16" – 8 hot tapping 4" – 16 hot tapping 2" .
8 stopple 16" – 8 stopple 4”.

Eductation

Academic Education :
- Diploma in Chemical Engineering .
- Specialization : Process Technology of Chemical Synthesize
- University : Azerbaijan State Petroleum Academy .
- Date of graduation : June 1997 .

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.