Professional Related Experience:
Jan. 2011 to Aug. 2012 :
- ASAS Contracting Ltd.
- Project Manager - North Al Hussin Gas Project –
Project Consisting of Gas Gathering Station – 6 Well Heads – 6 Flow Lines –
16" Gas Pipeline Length 28 KM & 8" Condensate Pipeline Length 22 km with Pumps
- Process and Piping Engineering .
- PFD & Design Basis and P&ID .
- Hydraulic Study and Sizing for Liquid and Gas Lines .
- Process Simulation for Gas and Condensate Pipelines on HYSYS 3.1
- Heat and Material Balance .
Jan. 2010 to Oct. 2010:
Engineering Company AGM –(Associated Group Management) :
Engineering and Consultancy Services for Upgrading Oudeh and Tishrine Oil & Gas Fields - OUDEH PETROLEUM COMPANY (Joint Venture Syrian Petroleum Company & SINOPEC China) .
- Process Engineering for Oudeh and Tishrine Oil Fields .
- PFD & Design Basis and P&ID .
- Hydraulic Study and Sizing for Liquid and Gas Lines .
- Process Simulation for Gas and Oil Pipelines on HYSYS 3.1 .
- Heat and Material Balance .
– Collection Station- Flow Lines and Track Unloading Pumps
– Separation – Oil Treating Tanks - Exports Pumps .
Bath Heaters , Electrical Heaters .
Sep. 2009 to Oct. 2009:
Gas Oil Technical Company:
Project Site Manager – Pre Commissioning - Commissioning and Start- Up for Jihar Project Stage – II –Gas Gathering and Processing Station- Hayan Petroleum Company (Joint Venture Syrian Petroleum Company & INA Nafta Croatia).
Aug. 2009 to Sep. 2009:
Gas Oil Technical Company:
Project Site Manager- Pre Commissioning - Commissioning and Start- up for 24” Syria – Lebanon Gas Pipeline and Metering Station & 10” Gas Pipeline From Metering Station to Power Station-
Ministry of Power – Lebanon .
Feb. 2009 to Apr. 2009:
Syrian Gas Company:
Project Site Manager of East Arak Project
-2 flow lines 6"and 2 well head skids & 8" pipeline 9 km
(Palmyra Gas Project - Syrian Gas Company) .
Oct. 2008 to Dec. 2008:
TECPESA-TBL : SPANISH COMPANY - HOT TAPPING PROJECT
Project Site Manager – Hot Tapping Project for 16" Jebbisa gas pipeline -in 8 locations.
8 spled tees 16" hot welding - 8 hot welds 4" – 16 hot welds 2"
8 hot tapping 16" – 8 hot tapping 4" – 16 hot tapping 2" .
8 stopple 16" – 8 stopple 4”.
Eductation
Academic Education :
- Diploma in Chemical Engineering .
- Specialization : Process Technology of Chemical Synthesize
- University : Azerbaijan State Petroleum Academy .
- Date of graduation : June 1997 .
Hot Categories
Chemicals
Batteries