Egypt Zones accountACCOUNT

4 yrs experience in Oil & Gas Projects & 1 yr experience in PMC Firm as Project Manager


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 5 years
Relocation: Yes - Internationally

Industry Experience
4 years Engineering Management
1 years Project Manager

Career Objective

To carve a niche in the organization by achieving its business objective through innovative and quality oriented mindset merged with professional expertise of strong management and technical skills.

Professional Experience

Hindustan Petroleum Corporation Limited (June’08 – May’12)

Period: Four Years approx. (Campus Selection joined as Construction Engineer)
Position: Senior Construction Engineer (Department of Engineering & Project)
Profile:
a. Execution of Mahul Railway Siding Revamping Project
b. Shifting of Mumbai Pune Solapur Pipeline Substation
c. HQO coordination for various Project Sites.
d. Other responsibilities involved-
• Monthly Safety Meetings held and ensured nil accidents.
• Project monitoring in terms of actual vs scheduled financial and physical progress.

Realization Technologies India Private Limited (May’12 Onwards)

Period: May’12 Onwards
Position: Project Manager
Profile:
a. Working as a Corporate Resource from Realization side for Trident Limited (Project of worth 2500 Cr.)
b. Working as Project Consultant for the Towel unit for Trident Limited.
c. Spearheading the Captive Power Project right from the conception stage
d. Using the principals of Critical Chain & Theory of Constraints in the Implementation methodology.

Profile Description:

Mahul Railway Siding Revamping Project [Oct’2008 to Sep’10]

• Project execution involved-
> Laying of the railway track (approx. 2300m) and Construction of T/w Gantry(632m long) & Culvert.
> Laying the pipelines from the existing tanks to the product pump house and to the gantry.
> Electrification of the entire system involving the use of VFD system for optimization of system.
• Managed five major contractors involved in the work.
• Commissioning of the new MPSPL substation along with the allied facilities.
• Shifting of the existing facilities from old substation to new substation without any operational man-hour loss.

HQO COORDINATION [Oct’2010 onwards]

• Coordination of Project sites of Bokaro, Paradeep, Budge Budge, Bathinda and Mandir Hasaud from the HQO includes following:-
• Coordination with the Consultant, check designs & preparation of tenders.
• Preparation of Project Monitoring Capsules for individual activities.
• Presentation to the Executive Director & Chairman on the progress of the project and preparation of budget for the allotment of project fund.
• Capitalization of the assets within the time frame.

Eductation

Graduation: B-Tech in Civil Engineering from NIT Surat.
Percentage – 85.7%
Final Year Project:- “Economic Evaluation and Feasability of Toll Highways in India” Under the guidance of Dr. N C Shah, NIT Surat.

Achievements

• Student Convener of Mindbend’07 (Technical Symposium of NIT Surat). Leaded a team of more than 120 students, successfully managed a three day event.
• Infrastructure Coordinator of Sparsh’07 (Cultural festival of NIT Surat).
• Selected among 30 students from all over India for Summer Camp 2006 organized by IIT Kanpur.
• Selected among 20 students among all NIT’s for SURGE’07 Research Program conducted by IIT Kanpur.
• Member of the ROBOCON’ 07 team of NIT Surat.
• Selected among 30 students from all over India for KVPY.

Certification

Organizational Trainings In ‘Hindustan Petroleum Corporation Limited’

• At IIM Ahmedabad, attended Management Development Program.
• Attended training Workshop on “Electric Cables” conducted by M/s Polycab India.
• Attended training on “Computer Aided Cost Estimation & Quantity Surveying Techniques” conducted by CIDCO India.
• Attended training on “Project Management” and “Safety at Construction Site”.
• Attended training on “Switchgears” conducted by M/s Larsen & Toubro.

Additional Information

I.T. Skills

• Well versed with ERP (JDE), MS Word, MS PowerPoint, MS Excel, Windows and Internet Applications, Concerto (Project Management Software uses the platform of MS Projects)
• Programming in C, C++

Achievements In ‘Hindustan Petroleum Corporation Limited’

• Promoted to Sr. Construction Engineer in March’2012 (among 35 out of Batch of 450).
• Awarded “Best Performer of Engineering & Projects all over India” for the Year 2010-11.
• Rated as an “Excellent Performer all over India” for the Year 2009-10.
• Ranked 5th in the batch of 450 employees in overall assessment after one year.
• Submitted “Design of Product Delivery System at Mahul” successfully working at Mahul Terminal.

Social Work

• Worked as a member of NIRVANA team in final year. NIRVANA was involved in teaching the children of under privileged working in the college campus.
• Organized a workshop for providing education on health, cleanliness and basic medical treatment to the people working in the college campus.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering 400-Project Management Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.