A Young and Dynamic Mechanical Engineer with overall More than Eleven years in-depth experience in the Oil & Gas, Nuclear Power and Pipeline, piping,
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 11 years
Relocation: Yes - Internationally
Career Objective
Maintain the QMS in place
Professional Experience
PROFESSIONAL EXPERIENCE
1.Cairn Energy India Ltd.
A)Project Undertaken: 03rd March 12 to at present (Brunel Energy)
Lead QA QC Engineer(Team Size-14 ABS Inspector)
Bhogat Terminal Project
B)Project Undertaken: QA QC Engineer (Team Size 7 ABS Inspector)
Bhagyam Trunk Pipe Line project (Construction, installation, testing, pre-commissioning and commissioning of the 24 production fluid pipeline, 24 water injection pipeline, 8 HDPE pipeline, SEHMS including tie-in to the facility at the Well Pad 15 & MPT). (Contractor: Punjlloyd & TPI: ABS inspection)
C)Project Undertaken:16th June 2008 to 11th September 2010
Welding Inspector
Storage Terminal at Viramgam near Ahmedabad. (Contractor: Indian Oil tanking Ltd).
2. RELIANCE ENGG. ASSOSIATE LTD.Jan 2007 June 2008
Welding Engineer Projects Undertaken: - East West Gas pipeline from Kakinada to Bharuch (48 dia line, working pressure 98 bar and test pressure 130 bar) project. (Contractor: China Petroleum Pipeline Bureau).
3. INDIAN OILTANKING LTD. April 2006 Jan 2007 QA QC ENGG
Projects Undertaken: Composite work for Siliguri Marketing Terminal of M/s NRL (Tankages & Piping works).
4. AVASARALA AUTOMATION LTD.Sept 2005 April 2006 QA QC ENGG
Project Undertaken:Handling, Installation, Alignment of End-shield Calandria Assembly, CS Liner FM Vault, CV Top Hatch Beam & Associated components, Reactivity Mechanism & Coolant channel installation in RAPP-6.
5. L & T, HED Oct 2004 Aug 2005 (10 month contract)QA QC ENGG
Project Undertaken:Handling, Installation, Alignment of End-shield Calandria Assembly, CS Liner FM Vault, CV Top Hatch Beam & Associated components, Reactivity Mechanism & Coolant channel installation in RAPP-5.
6. D K INDUSTRIAL SERVICES April 2004 Sept 2004 (6 month contract)
RT INTERPRATOR
7. Isotope Teknica Ltd Dec 2002 Mar 2004 (18 month Contract)
Site In charge
8. TECHNO ENGINEERS Sep 2001 Dec 2002 (16 Month Contract)
Trainee Engineer NDT
Eductation
Diploma in Mechanical Engineering from Board of technical Education, Jodhpur in the year 2001.
MBA from ICFAI (Distance Learning Program) under study.
Certification
CWI (Certified Welding Inspector) from American Welding Society (AWS) in 2006.Valid up to Dec 2015.
ASNT LEVEL II in RT, UT, MPT & LPT and BARC level-II in RT.
Additional Information
HSE Award March 2011 Proactive HSE behaviours in MDPL project.
HSE Champions Nov 2011 - Certificate of Appreciation for the commendable work in BTPL project for proactively reporting the unsafe conditions & upholding the CIL HSE standards.
Pat on Back Award Nov 2011 instrumental to keep the repair rate for the pipeline below 4% by way of continuous monitoring & training to welders. A substantial role not only in QA/QC but execution also and contributed lot in timely completion of the project.
Hot Categories
Chemicals
Batteries