construction manager -oil and gas experience civil engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
A dynamic professional with 26 years of rich experience in Execution, Planning
& Management of Civil Construction Projects .(15 years of Oil & Gas project
Professional Experience
I am looking for a challenging position in your renowned organization, where I can utilize my experience and education.
MY QUALIFICATION & EXPERIENCE INCLUDES:
A dynamic professional with 26 years of rich experience in Execution, Planning
& Management of Civil Construction Projects .(15 years of Oil & Gas project and 10years in Power project and one year in Industrials and petro chemical project at Dubai and Qatar & Saudi Arabia & Oman &India )
Oil and Gas Plant:-
Projects involved.
• Phase 2 is the expansion of facility to incrementally increase the water and flooding capacity together with modification of CPF.
• New Water Treatment Plant (WTP Lots 1, 2 & 3) and Central Processing Facilities Upgrades (Dehydration Unit, De-Oiling Train 3 and Balance of Plant) at the existing Occidental Mukhaizna facilities in Oman.
• The execution and completion of the PROJECT will be through Construction Engineering (Not Detail design engineering) procurement and Construction services.
• Construction of Cylinder filling shed for Emirates Gas plant in Dubai.
• Construction of oil pipe line for Indian Oil Corporation Assam and Gujarat, India.
POWER PLANT:-
Projects Involved-
• Installation of 3x70MW Gas Turbines (GE Make – Frame 7) & BOP at Tabouk Power Plant Extension Project (Stage 2) – Saudi Arabia.
• Installation of 16x70 MW Gas Turbines (GE Make – Frame 7) & BOP at Rabigh Power Plant Expansion Project (Stage V)—Saudi Arabia.
• Installation of 12x70 MW Gas Turbines (GE Make – Frame 7) & BOP at Rabigh Power Plant Expansion Project (Stage VII) – Saudi Arabia.
• Construction of 66/33 kV Switch yard 220 kV Switch yard, Transformer foundation, Control room building, for TATA Electric co in Mumbai - India
Sub Station Buildings Works :-
• Erection of 220/110 KV Sub-station at Doha –Qatar Transmission system Extension (KAHRA MAA) under Phase VI, part 01 (GTG-5/2004) – EPC contract with Total value of 1.9 Billion Euros.
Industrial Buildings: -
• Construction of Techno park Industrial building for Gagaru plastics in Dubai.
Construction of Ware house for Al –Eassa Groups in Dubai