Petroleum/ Well site Operations and Production Technology Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 11 years
Relocation: Yes - Internationally
Career Objective
Petroleum/ Well site Operations and Production Technology Engineer
Professional Experience
Study new techniques and technologies and decide on applicability for production enhancement and optimization such as sand control and hydraulic fracturing stimulation techniques.
Study land & marine wells to carry out and recommend the necessary actions Proposal of reservoir parameters for ESP & S/R design.
Production Technology and artificial lift design and material selection (Mainly ESP and Sucker Rod pumping).
Control over ESP equipments and material selection, handling and field Installation
Interpretation for Running and pulling reports of ESP.
Production and system performance analysis by analyzing the production parameters, the data of down hole monitoring systems by Multi-Sensors and interpretation of multi-sensor data for ESP wells.
Following up and analysis beam pumps performance mainly using dynamometer Surveys.
Writing special reports such as artificial lift systems failure and run life analysis, work over results, all concerned reservoir reports and schedules and economic studies.
Proposing well completion & intervention programs outlines.
Water sources identification & shut-off using different techniques.
Proposal & definitions of completion, intervention and work over programs.
Revise outlined completion, work over and well test programs.
Follow up workover operations and provide recommendations and corrective actions needed.
Follow up and report of the daily activities for drilling & work-over operations.
Writing weekly, monthly and annual activity reports.
Fields & reservoir monitoring through valid bottom hole pressure surveys
(Amerada, Memory Gauges, Sonolog & down Hole Multi - Sensor),
Accurate fluid & gas rates allocation for zones & wells, water injection rates allocation and supervision.
Production problems and formation damage troubleshooting.
supervision of well site operations for :
Cased hole logs Interpretation, PLT, TDT, CNL, CBL, USIT, CAST, and RST logs.
Water shut-off jobs by bridge plug, squeeze cement, straddle packer Perforations, casing gun, TCP gun.
Stimulation (Acid wash ,nitrogen lift by using c.tbg,matrix treatment, Acid fracture, Gravel-Pack and Pre-pack screen, Extension pack and Hydraulic fracture, Expandable screen)
DST ( drill stem test ) & Well testing ( build-up test , drawdown test , fill-up test , infectivity and fall-off test )
Eductation
2000 B.Sc. in Petroleum Engineering, Faculty of Petroleum and Mining
Engineering, Suez Canal University, Egypt.
Certification
1)(Enhanced Oil Recovery) course, “GPC training center, 2003, Egypt
2)( Advanced Well Logging ) course, “GPC training center – 2004, Egypt
3(Hydraulic Fracturing and Well Treatment ) “Cairo University, April-2005”.
4)(Defensive Driving & Road Safety) “IEOC, June-2006”.
5)(Well Completion & Work over ) “Cairo University, MARCH-2007”.
6) (Water Flooding Design, Operations and Monitoring) "Oil & Gas Skills"NOV., 2007 .
7)(Petroleum Reservoir Management)"Suez Canal University, July-2008”.
8) International Well Control Forum (IWCF) "Randy Smith", July-2009”.
9) Tropical Helicopter Underwater Escape Training ( Petrolift Egypt ,
April, 2010
11)Well Test Analysis "EITD Center" June-2010
12)Eclipse Black Oil Simulation & Petrel Reservoir Engineering (Schlumberger Cairo, October 2011 )
13) SUCKER ROD PUMP DESIGN ( LUFKIN EGYPT , DEC-2012)
Additional Information
1) PTW ( Permit To Work )
2) Hazard Identification and Risk Assessment (Isolation Procedure)
3) Audit and Inspection
4) Accident Investigation and Analysis
Hot Categories
Chemicals
Batteries