Planning Engineer / Planner / Scheduler
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 7 years
Relocation: Yes - Internationally
Career Objective
An excellent multi-skilled Engineer with 6 Years abroad experience in Project Management & Planning in Heavy Equipment of Vessels, Tank, Coolers, Column, and Exchangers in oil & gas refineries and petrochemical plant.
Professional Experience
Responsible for estimation of the new project works
Responsible for monthly invoice preparation & approval from Client
Identify resource requirements for the scheduled jobs using the job plans & preparing matrix for hiring extra resources.
Build the “week schedule” making the most effective and efficient use of available resource and issuing the schedule.
Planning, preparation and scheduling of maintenance activities. Includes follow-up with Operations personnel for coordination of maintenance works ensure resources availability prior to scheduling and control of backlog work. Follow up on the scheduled maintenance by visits to assigned areas to ensure work progresses according to planned programs.
Involved in Preventive maintenance, Routine maintenance shutdown of Columns, Heat Exchanger, Cooler, Pipe Line modification removal & installation, PSVs, FCVs removal, Overhauling, Calibration & reinstallation.
Ensuring that all the rules and regulations of Health, Safety & Environment Policy are included in all the maintenance plans & obtain all necessary permits.
Forecast of Resource Requirement and Material requirement as per contractual requirements.
Project coordination between different departments to achieve the target.
Perform Job walk / site verification to ensure job packages are fully complete and satisfactory
Fully study and present to team in all aspect.
Planning & monitoring the construction & maintenance activities which include the responsibility for the planning and coordination of all manpower and equipment, materials, supplies and sub-contracted services.
Attending the emergency jobs to avoid production losses
Trained & Familiar for using Breathing Apparatus, SCABA for High H2S process equipments like Vessels & Storage Tanks.
Attending the Job as per the Work priority given by the Client.
Responsible for the Fabrication for Flow Line, Manifold & well head hook up as per the schedule
Allocating the resources as per the work scope
Co-ordination between the main Client, Sub-contractors and Vendors to get the necessary action/information related to the project
Preparing the hand sketch for flow line to monitor the daily progress
Responsible for the reporting of daily & monthly maintenance report to the client
Eductation
Diploma in Mechanical Engineering - (DME)
Government Polytechnic, Latur - INDIA
Post Graduate Diploma in Piping Design Engineering & Construction
Asian Academy of Professional Training - Pune
P3 – Primavera Project Planning
P6 – Primavera Project Planning
MS Office (Word, Excel, Power Point)
Certification
H2S awareness & Escape hood
Confined Space & Escape
Job hazards analysis
Additional Information
Manpower co-ordination
Extracting the maximum output from the manpower.
Interacting with clients
Materials orders and follow up
Safe execution of jobs
Planning and Implementing time study as well as work-study
Shutdowns attended (MRTA, GRTA – 2009, 2010 of KNPC MAA – Kuwait)
Shutdown Attended (Gas Plant shutdown for year 2011 2013, CPF – Central Production shutdown for year 2012, Shutdown of Gas Plant of year 2012 for unit 600 & unit 2600 of Occidental of Oman – OXY)
Hot Categories
Chemicals
Batteries