Electrical engineer with 4 and half years experience in total in qatar, india & kazaksthan.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
To excel in assigned responsibility and thereby ensure professional and personal growth along with the goals and aspirations of the organization. Being dedicated and hardworking I would like to contribute my best to my prospective organization.
Professional Experience
Kazmunai Services & Contracting LLP: from 2012 October till date
Contract work at connect builders and developers company(Bangalore): 2011 sep to 2012 sep.
site engineer , Phase VIII Isolux project through Advanced technical services, Doha, Qatar June-2010 to feb-2011
site engineer for 2 sites,PhaseIX Siemens project through Advanced technical services, Doha, Qatar March-2011 to aug-2011
Eductation
Course: B.E
University/Board: Vishweshwaraya Technological University
Institution: St Joseph Engineering College
Year of Passing: 2009
Certification
Certificates of training to work in Offshore [BOSIET] by YKK Kazakhstan.
Certificates of training (H2S & face fit)to work in offshore and onshore live gas
Plant.
Additional Information
Installation and maintenance of 0.4kv & 11kv panels.
Installation and maintenance of DC charger, Inverter, Distribution & Control panels.
Installation and maintenance of 110v 2295Ah Battery banks.
Supervise the installation of cable trays, raceways, conduits, lightings fixtures, motors and electrical equipments.
Supervise the Lv, Mv and Control Cable pulling.
Supervise various typesf termination of instrument cables, low voltage, and medium voltage power cables.
Supervise various types of grounding works.
Cable insulation test (meggering up to 5kv) and contact resistance test, Earth resistance test.
Assisting and supporting GIS supervisor for GIS erection and Commissioning.
Prepares drawings and construction procedures priors the installations.
Preparation of work permits for every daily site work.
Knowledge of protection device, controlling device and control circuit modification and making the red mark drawing.
Preparation of as built drawings, attending snag points and Maintenance of substation during warranty period.
Executing the scope of heat tracing of pipelines, vessels , tubes ,etc to maintain the inner temperature in extreme climates and to prevent the liquids from getting frozen.
Installation of all kinds of fire & gas instruments.
Kashagan Field Development Project - Experimental Programme [gDh- Island – Offshore].
Kashagan Field Development Utility Project.
[ATYRAU REFINERY-Onshore] [Kazakhstan
Hot Categories
Chemicals
Batteries