Egypt Zones accountACCOUNT

M Sc Senior Drilling Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 12 years
Relocation: Yes - Internationally

Industry Experience
12 years Engineering - Drilling

Career Objective

Pursuing a challenging career in Petroleum and Natural Gas Engineering, working with a multidisciplinary team to study and analyze all the aspects related with the management of drilling engineering onshore and offshore projects.

Professional Experience

Senior Drilling Engineer Consultant. Ecopetrol. S.A.
Bogotá, Colombia. June 2010 – January 2014.

Responsible for well planning and well execution for Cupiagua Field.
Accountable for well planning and well execution tasks for
complex producing, injector and re entry wells with depths up to 18,000 ft,
complex lithology, challenging pressure regimes and tectonic behaviors.

Important achievements:
Wells with better technical and economic performance than the wells performed by previous operator,challenged traditional technical paradigms to drill reservoir formations,introduced technologies never used in the country, Colombian drilling records for small hole diameters in hard rock formations with turbine assemblies, successful access to existing wells.


Drilling Engineer. BP Exploration Company Colombia Ltd.
Bogotá, Colombia. December 2006 – May 2010.

Responsible for project management in well planning and well execution
for BP major projects on Santiago de las Atalayas and Pidemonte contracts.
Accountable for well planning tasks such as preparation of the long and lead
items, analysis of offset wells non drilling surprises, risk analysis, definition of mechanical status, follow up of the geomechanical analysis, definition of directional trajectory, inclusion of offset wells lesson learns, coordination with contractors, execution of basis of design, visualization of risks in 3D, location preparation, verification of contracts status and government requirements, group loadings, Casing Design, definition of BHAs, hydraulics, torque and drag and drilling parameters, follow up of contractor programs, time and cost analysis, execution of peer reviews, meetings with
communities, drill well on paper, execution of simmops documents if
required and spud meeting. Utilization of landmark platform to perform
engineering calculations.

Accountable for well execution tasks including daily well follow up on well
Performance and logistics, time and cost analysis, lessons learnt and risk
assessments meetings, performed specific drilling guidelines and drillers
instructions, engineering support to the field engineering team, constant
verification of well plan compliance, monitoring of equipment needs,
decision making.

Eductation

M.Sc. in Petroleum and Natural Gas Engineering. West Virginia
University. Morgantown, WV. May 2000.

B.Sc. in Petroleum Engineering. Universidad de América.
Bogotá, Colombia. December 1995.

Certification

IADC WellCAP Well Control. January 2014

IADC DIT Stuck Pipe Prvention. December 2013

IADC Rig Pass. December 2013

Additional Information

Languages: Fluent in English and Spanish.

Computer: Programming in Visual Basic 6.0, Operating Systems Windows
NT/98 – 2000, XP, Vista, Windows 7.

Software applications: Microsoft Office Suite, Pipe Flow, Memolog, MitPro
Geoservices Main Gx V3.1.1, Geodec, Wellz, Spectrum.
Landmark software applications including Wellplan, Compass, Wellcat,
Stresscheck, Dims, Open Wells.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
800-Drilling Artificial Lift » News » Cementing, Stimulation » News » Directional Drilling » News » Drilling » News » Drilling & Well Services » News » Drilling Engineering & Equipment Systems » News » Logging, Perforating, Testing » News » Offshore Drilling » News » Reservoir/Completion Consultants » News » Workover & Well Services » News » Workover Rigs/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.