Egypt Zones accountACCOUNT

be electrical engineer as trainee


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 1 years
Relocation: No

Industry Experience
1 years Electrical Engineer

Career Objective

To Seek An Exciting Career In An Organization That Takes Best Use Of My Skills And Has Good Prospects For Growth, To Obtain A Position That Allows My Skills In The Successful Execution & Planning Of Projects

Professional Experience

 Goldi Green Technologies Pvt.Ltd. Is Pv Module Manufacturing Company With Capacity Of Producing 100mw Pv Modules Per Annum And It Is Solar Base Company

 Job Responsibilites:
 Working In Laminator And Testing Process Department AND SUPERVISING THIS PROCESS
 In Lamination:
• Using Laminator Machine Pv Module Laminate
• Before Laminate Module Check Module Eg. Cell Crake
• Check Lamination Process (Four Process)1.Vacuum Process 2.Membrin Press Process 3.Lamination Process 4.Inflation Process With Its Given Time
• Check Machine Loading And Un Loading Module
• Check Machine Work Properly And If Not Working Than Reset All Data
• Check Machine Tempertature ,Pressure And Time
 In Testing:
 In Testing Check Following Parameter:
 Using Sun Simulator Testing Pv Module
 Check Maximum Power Voltage And Current
 Check Open Cicruit Voltage And Short Cicruit Current
 Check Loding Current Voltage And Power
 Also Check Moule Effciency And Filling Factor
 If Above Parameter Not Its Peset Value Than Pv Module Rejected
 Aalidhra Textile Engineers Ltd. Is Textile Machine Manufacturing Company. Textile Engineering Products Includes P.O.Y. Processing Machinery, Yarn Processing Machines, Crepe Texturing Machines And Automatic Weaving Machines And Water Jet Looms
 JOB RESPONSIBILITES:
 As Trobuleshooting Engineer Check Follwing Parts Of Water Jet Looms:
 Check Hookpin And Clamper, Main Motor (Syncronous Or Indution Motor), Break Unit(Rectifier,Capicitor,Diode ,Ssr,Fuse),Feeder Motor,Stepper Motor,Change Valve,Contactor,Star Delta Starter ,Phase Monitoring Device,Motor Wiring And Connection,Push Botton,Smps And Display Unit Of Water Jet Looms Machine Properly Work.
 Machine Works On 3phase 415 V Electric Panel. So Check If Any Fault In Electric Parts Of Panel Than Check Fault And Solve It.
 Machine Work On Microprocessr Using Five Card(I.C.) 1.Main 2.Clamper And Hookpin 3.Let-Off 4.Analog 5.Feelar Card Check This Five Card Properly Work If Not Than Solve It.Eg.Machine Not Work In Forward And Reverse Direction.
 And Measure Voltage ,Current ,Power ,Coil Resistance Using Multimeter If Not Its Peset Value Than Sovle It.

Eductation

 Standard 10TH From Gujarat Secondary And Higher Secondary Education Board In 2007 With 72.92% Mark
 Standard 12TH FROM Gujarat Secondary And Higher SECONDARY Education Board, ,In 2009with 59.40% Mark
 B.E.In Electrical Engineering From Gujarat Technological University, In 2013, 8.13 Cgpa And 76.40% Marks

Certification

 Project and Extra Activies:
 Project Title: Automatic Active Phase Selector From 3 Phase Supply To Single Phase Load
 Participated In A Workshop On Enery Conservation Organised By GEDA- Gujarat Energy Development Agency.
 Paricipated National IT Apptitude Test

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.