DME + DPT + BE (Production S/W)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 0 years
Relocation: Yes - Internationally
Career Objective
Intend to build a career in leading corporate with committed and dedicated people. This will help me to use my abilities and skills for organizational and personal growth.
Professional Experience
Company: Sandvik Asia Pvt. Ltd., Pune
Duration: 6 Months (01st Jan. 2012 to 30th Jun. 2012)
Designation: Intern Trainee
Project:
Name: Modification of unloader of packing station of Sandvik Rock Tool’s DDR line.
Responsibilities:
Feasibility check for modification
Prepare Design of Modification and Bill of Material (BOM)
Supervise Fabrication
Testing Of Modification
Name: Preventive maintenance air cooled type air conditioning units.
Responsibilities:
Collect data of all Air Conditioning Units
Prepare check sheet & preventive maintenance schedule for different types of Air Conditioning Units
Name: Compressed air leakages in distribution network.
Responsibilities:
Collect data of distribution piping & draft it
Find out leakages in Distribution Piping
Redesign & repair of distribution network as a remedies
Name: Study of the up gradation of return water tank’s pumping station.
Synopsis: Study the return water pumping station which helps to utilize the water reuse for process. Compare the old and new pumping station on its technical specification. Study the new equipment’s like priming pot, pressure pot, etc. which installed on the pumping station for acquiring new trends.
Company: Cadbury India Ltd. Pune
Duration: 6 Months (15th Jun. 2010, 14th Dec. 2010)
Designation: Intern Trainee
Project:
Name: Bagasse boiler black smoke reduction & efficiency enhancement.
Responsibilities:
Collection of data to find out causes of black smoke & efficiency reduction
Find out actions to take care of black smoke & for efficiency enhancement
Observe preventive maintenance
Name: Cornucopia chocolate production & improvement of Overall Equipment Effectiveness (OEE) of SAPAL bunch wrapper.
Responsibilities:
Feasibility check for new product line
Collection of data for calculation OEE
Find out actions to improve OEE
Monitoring of SAPAL bunch wrapper in Production Line
Name: Modification of two roll refiner pipeline of T reactor crumb stream.
Responsibilities:
Feasibility check for modification
Prepare design & BOM
Observe fabrication work
Testing of modification
Eductation
Degree Year College/University GPA / Percentile
B.E. (Production Sandwich) 2012 Pune University 70.21 %
Diploma In Production Technology 2009 Maharashtra State Board Of Technical Education 69.42 %
Diploma In Mechanical Engineering 2008 Maharashtra State Board Of Technical Education 55.54 %
Certification
PTC Certified Design Engineer (ProE Wildfire 4 & Creo 2.0)
Hot Categories
Chemicals
Batteries