Around 8 years of experience as Planning Engineer and in-depth knowledge of Planning / Scheduling methods and procedures related to project work. Exec
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
Result-oriented technocrat with rich and qualitative experience in the area of Planning, Site Engineering.
An effective leader and communicator with strong interpersonal, leadership, analytical and relationship management skills.
Professional Experience
ONGC-MANGALORE REFINERY AND PETROCHEMICALS LIMITED.
Jan’07 – Till Date
Current Designation: Senior Engineer
Project Title: 122 MW Cogeneration Power Plant (Nov 2010 till date)
Value: 12.67 billion INR
Description
The Plant meets Power and Steam requirements of new units of the expanded refinery. It has two Gas Turbines (26 MW and 37 MW) and two Steam Turbines (29.5 MW each.) which cater to the requirement of Power. The requirement of steam is met by 4 nos. Utility Boilers and 2 nos. HRSGs
Responsibilities
Responsible for preparation of Baseline Program for project at the tendering stage as per the scope of work in Primavera version P6.
Delivered Power Point Presentations at various levels
Coordinated with Consultant, Contractor & statutory authorities (Boiler Inspector and Labor inspector) for work inspections and approvals.
Conducted site progress review meetings for monitoring of project, identifying problems related to work progress & highlighting of the same
Project Title: Revamp of Gas Oil Hydrogen Desulphurization (July’ 08 – Nov’ 2010)
Value: 1.15 billion INR
Description
Increasing throughput by 30% and Production of Euro IV compliant low sulphur Gas Oil. Main modification was introduction of a new reactor and associated equipment.
Responsibilities
Preparation of Baseline Program for project at the tendering stage as per the scope of work.
Review & analysis of Contract documents for each Procurement and Construction Package and advice the Projects Manager of any planning deficiencies from scheduling point of view.
Cost loading and monitoring the cash flow & project progress.
Review of Progress Reports/Charts and submit to the Department Heads.
Other Projects handled
• Title: Revamp CDU-1 (July’ 08 – Nov’ 2010)
Value: 1.75 billion INR
Description: Increasing throughput by 30%.
Responsibilities: Similar to that of Revamp of GOHDS.
• Title: Raw Water Treatment Plant: (Nov’ 2010 - till date)
Value: 0.4 billion INR
Description: The plant is designed to treat 1231 cum / hr raw water to meet the additional
demand of treated water consequent to expansion of the Refinery, for Cooling Towers, DM plant and utilities.
Eductation
Bachelor of Engineering in Mechanical Engineering.
Senior Secondary Board Exam (XII) Passed in 1997 (First Class)
Secondary Board Exam (X) Passed in 1995 (First Class)
Certification
Project Management Professional (PMP )
Certified In Project Management ( CIPM )
Primavera P6.
Course in Project Management by PMI, Bangalore.
Training on Gas Turbines and Steam Turbines by BHEL.
Additional Information
COMPANIES
ONGC-MANGALORE REFINERY AND PETROCHEMICALS LIMITED. (Jan’07 till date)
STEEL AUTHORITY OF INDIA LIMITED ( Jun’06 to Dec’06 )
SOFTWARES
PLANNING: PRIMAVERA P6, MS PROJECTS
GENERAL: MS OFFICE SUITE, LOTUS NOTES
OS: WINDOWS 7, VISTA , XP
DESIGN: AUTOCAD
PROJECTS
122MW Cogen Power Plant Nov ’ 2010 – till date
Raw Water Treatment Plant Nov ’ 2010 - till date
Revamp CDU-1 July ’ 08 – Nov’ 2010
Revamp of Gas Oil Hydrogen Desulphurization. July’08- Apr’10
3no.s of Mounded Bullets (3 x 3000 cum) July’07-Dec 07
Fire Water Pump House Augmentation Nov’07-June’08
Tanks (2 fixed roofs and 3 floating roofs). Apr’08 – Dec ‘09
Annual maintenance shutdowns.
SKILLSET
Project Planning using Primavera P6 and MS PROJECTS.
Project Integration
Scope, Schedule and Cost Management
Knowledge of multi-disciplinary engineering from project point of view.