total 4.2 year experience in power plant erection commissioning and maintenance(all mechanical equipment,pipe line etc).....now i'am in O& M section
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
Intend to a build a career with leading corporate of hi-tech and environment with committed & dedicated people which will help me to explore myself fully & realize my potential, willing to work as a key player challenging & creative environment.
Professional Experience
Total 4.2 Year experience in power plant erection, commissioning and maintenance.
2.8 year of experience in Project of Mechanical Erection and Commissioning.
1.4 year of experience in power plant rotary parts maintenance (super critical thermal 660x5 MW unit)
Experience in Technical Documentation and Mailing.
Experience in Project Planning, Management Reporting and Coordination
experience.
Having degree in mechanical Stream.
well experience in preparation of bill of material for mechanical works for invoicing, estimation of claims, cost of inventories, vendor billing
Outstanding problem solving skills.
Effective in facilitating communication between management and project team.
Improved business efficiency by writing a technical operation and maintenance manual for all equipment.
Formulated innovative ideas to upgrade the performance of mechanical equipment.
Planned innovative activities to develop teamwork.
Project co-ordination and control
my site
BHUSHAN POWER &STEEL LTD (NOVA IRON) ,BILASPUR ,C.G March 2014 to till date
PROJECT ENGINEER (POWER)
• Heavy equipment and pipe line erection work
• Commissioning work of all mechanical equipment’s
• Able to read all engineering drawings and P& ID
ADANI POWER MAHARASHTRA LTD TIRORA, MH Sep 2012 to Jan 2014
SITE ENGINER (MAINTENANCE) (660X5 MW) under PESPL
• OVERHAULING OF ROTATING EQUIPMENTS like mill & fan parts (mill rollers, roller grinding wheel, bullring segments, fan blades), feeder belt replacement etc
• Laser alignment & dial gauge alignment
• Alignment of heavy motors like mill motors ,ID fan, FD fan, PA fan seal air fan (660MW) & lube oil system motors(screw Pump) etc,
• preventive maintenance , brake down maintenance &Shutdown maintenance
• knowledge about all power plant system’s, pipe line and industrial safety
NATIONAL THERMAL POWER CORP LTD,SIPAT , C.G Jul 2012 to Sep 2012
SITE ENGINEER/Erection & Commissioning Project coordinator, under PESPL
• Boiler circulation pump erection, (500X2MW) Power Plant capacity
•
Eductation
B.E. 2006-2010 M PCCET, Bhilai (C.G.) 71.85%
Mechanical Branch
12th 2004 Kerala Board 59.16%
Higher Secondary Certificate Examination
10th 2002 Kerala Board 63.83%
Certification
training from Department of Design IIT Guwahati
Project : Design and fabrication of a” Remote controlled robotic bomb disposal vehicle
Duration : Four weeks (18th may 2009 to19th June 2009)
second training : Department of Design IIT Guwahati
Project : Live project on design and fabrication of cruising ship parts in FRP
Duration : Four weeks (20th may 2008 to 23rd June 2008)
Additional Information
Operating Systems : Windows 95, 98, Windows XP, Windows7, Windows Vista.
Databases : Microsoft Office (Excel, Access, Word, PowerPoint).
Software : Diploma in “UNIGRAPHICS NX4, Tally 5.4, 7.2 , AutoCAD
Methodologies : Heavy fabrication structures, manufacturing process, engineering drawing, Bill of Material , Erection And Commissioning, Project Planning, Management Reporting and Coordination, engineering drawing
Passport Details :-
Passport No : J3948662
Date of issue : 24/05/2011
Date of Expiry : 23/05/2021
Place of issue : TRIVANDRUM