Engineering Trainee
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 1 years
Relocation: Yes - Internationally
Career Objective
Ambitious to work in an organization where I can utilize and enhance my capabilities that helps to groom myself and add value for the organization.
Professional Experience
• Assist well completion at three different locations/ wells namely Sui-98 (Horizontal), Wafiq X-1 and Adhi- 19 (T/K).
• Assist Drill Stem Test (DST) at two different locations/ wells namely Chachar- 4 and Aro Khan X-1.
• Part of the team responsible to manage services for Hydraulic Fracturing at Adhi – 19.
• Supervise Downhole camera job at Adhi 13 to identify point of leakage.
Eductation
• M.Sc. Petroleum Technology - 2011 (Secured 2nd Position)
Department of Petroleum Technology, University of Karachi
Certification
• Hydraulic lift system by Mr. Toby Bugh (Weatherford)
• Mud Logging concepts by Mr. Qamar Iqbal (Weatherford)
Additional Information
•To assist in designing, coordinating and execution of well completions, rig workover operations, milling/retrieval of Packer, different types of well interventions (coiled tubing, wire-line and slickline) such as production logging & cased hole logging, perforation, tubing puncture, nitrogen kick-off, acid stimulation, well bore fill clean out, scale removal, BHP survey, setting & retrieving of Downhole plugs, etc.
•To assist drill stem test (DST) including tubing conveyed perforations and various well tests such as isochronal, modified isochronal, flow-after-flow, draw down, buildup tests, and post completion tests.
•To coordinate with different service companies personnel for in-time mobilization and to implement plan effectively.
•Prepare specifications and arrangement of material required for wells (down hole & surface) along with evaluation of technical quotations.
•Prepare budget and cost estimates for well completion equipment/operations, well testing, and various well intervention activities. Monitor operation's budget and validate contractor’s service tickets / invoices.
•To ensure that all the operations are carried out in safe manner. Also to manage the workforce including contractor's crew and particularly in time accomplishment of jobs.
•Periodic updates of activities at well site along with job sequence and task completion to head office.
Hot Categories
Chemicals
Batteries