Thirty five years’ experience construction of oil gathering station, rehabilitation Oily - Water tank, replacement gathering pipeline, main Oil pipel
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
The organization works to improve the technology of oil and ... and the cost of oil and gas. Providing compilation and timely reporting on the established oil fields.
Professional Experience
The organization works to improve the technology of oil and ... and the cost of oil and gas. Providing compilation and timely reporting on the established oil fields. Promote oil production by gas lift method, with a deep well pump with a screw pump and method fountain
field construction, implementation of work on the optimization of production costs, reduce the cost of oil / gas ... Analysis of design and contract / sub-contractors and for pre-design studies, projects, drilling, production, necessary materials, equipment, instruments and transportation
Reconstruction of Gas central processing plant Installation additional gas compressor exchanger air coolers storage tank flare system water separation, drainage. Repairing and construction of gas pipeline, Pig launcher pig receiver. Organization of Gas selling.Organization of supplying high pressure gas to field wells maintenance gas compressors Pressure 70-75 Br.
High pressure gas distribution manifold maintenance gas lift and sump pumps wells
Construction of Gathering station, rehabilitation Oily - Water tank, replacement gathering pipeline, main
Oil pipeline, construction of new well location, construction of mobile test separator, installation of test tank, metering skid, pumps and et. Construction of Water Separation unit. Construction of Oil processing center (oil storage tanks, water separation system, pipe erection, exchangers, Gas separators, gas flare system, Oil pumps, water pumps, Water treatment
Eductation
Azerbaijan State Technical University Mechanical Engineer (HB No. 957553)
Additional Information
Organization of supplying high pressure gas to field wells maintenance gas compressors Pressure 70-75 Br.
High pressure gas distribution manifold maintenance gas lift and sump pumps wells