Egypt Zones accountACCOUNT

Thirty five years’ experience construction of oil gathering station, rehabilitation Oily - Water tank, replacement gathering pipeline, main Oil pipel


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 20 years
Relocation: Yes - Internationally

Industry Experience
20+ years Engineering - Petroleum
20+ years Mechanical Engineer
20+ years Engineering Management

Career Objective

The organization works to improve the technology of oil and ... and the cost of oil and gas. Providing compilation and timely reporting on the established oil fields.

Professional Experience

The organization works to improve the technology of oil and ... and the cost of oil and gas. Providing compilation and timely reporting on the established oil fields. Promote oil production by gas lift method, with a deep well pump with a screw pump and method fountain
field construction, implementation of work on the optimization of production costs, reduce the cost of oil / gas ... Analysis of design and contract / sub-contractors and for pre-design studies, projects, drilling, production, necessary materials, equipment, instruments and transportation


Reconstruction of Gas central processing plant Installation additional gas compressor exchanger air coolers storage tank flare system water separation, drainage. Repairing and construction of gas pipeline, Pig launcher pig receiver. Organization of Gas selling.Organization of supplying high pressure gas to field wells maintenance gas compressors Pressure 70-75 Br.
High pressure gas distribution manifold maintenance gas lift and sump pumps wells
Construction of Gathering station, rehabilitation Oily - Water tank, replacement gathering pipeline, main
Oil pipeline, construction of new well location, construction of mobile test separator, installation of test tank, metering skid, pumps and et. Construction of Water Separation unit. Construction of Oil processing center (oil storage tanks, water separation system, pipe erection, exchangers, Gas separators, gas flare system, Oil pumps, water pumps, Water treatment



Eductation

Azerbaijan State Technical University Mechanical Engineer (HB No. 957553)

Additional Information

Organization of supplying high pressure gas to field wells maintenance gas compressors Pressure 70-75 Br.
High pressure gas distribution manifold maintenance gas lift and sump pumps wells

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering 700-Petroleum and Geology Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News » Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.