Egypt Zones accountACCOUNT

power plant operation engg gas based with 5 years with ccpp capacity 594.067 MW (106.617+112.45+375).


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 5 years
Relocation: Yes - Internationally

Industry Experience
5 years Plant Engineer

Career Objective

To secure a challenging position where I can effectively contribute my skills as Power Professional, possessing competent Technical Skills.

Professional Experience

I’m working with Gujarat State Electricity Corporation Limited since 16-july-2009 in Junior Engineer cadre of their Gas based COMBINED CYCLE POWER PROJECT (CCPP) at Dhuvaran having 3 units with combined capacity of 594.067 MW (106.617+112.45+375).

1. Gas turbines of 70 MWs of frame 6FA in unit no.1 and 6FAe+ category in unit no.2.
2. Make: General Electric.
3. Control system: Mark V in unit no.1 and VI Control system in unit no.2.
4. Steam turbines of 40 MWs triple injection type.
5. Make: - BHEL.
6. Control system: MAX DNA DCS control system.
7. Heat recovery steam generator is of triple drum horizontally unfired type.

8. 375MW CCPP DETAILS

a. SINGLE SHAFT POWER TRAIN MODEL - SCC5-4000F-1S (1GT+1Gen+1ST) (SIEMENS)
b. VERTICAL HRSG, TRIPLE PRESSURE AND REHEAT TYPE (L&T).
c. RECTANGULAR SURFACE CONDENSER (L&T HED).
d. 220KV SWITCHYARD (ALSTOM).
e. 477MVA GENERATOR TRANSFORMER (HYUNDAI).
f. Control system: SPPA-T3000.
For Past 5 years I’m looking after the operations which includes.

1. Start-up and synchronizing the unit successfully with grid,
2. Shutting-down i.e. isolating it off the grid safely and emergency tackling.
3. Charging and isolation of Switch yard having 132 kV & 220 kV high tension lines.
4. Charging and isolation of Electrical auxiliary control panel which includes Station auxiliary transformers and Station service transformers.

Besides an operation desk-engineer I’m Active member of teams for PAT, Tripping Analysis, and Coordination & Planning during shutdown etc.

Eductation

Degree Board/University Score Year of Passing
SEMESTER SGPA
EXECUTIVE MBA (EMBA) Power Management (2012-2015) University of petroleum & energy studies (UPES) Dehradhun 1st 2.92/4 Jan-15
2nd 3.18/4
3rd 3.09/4
4th 3.56/4
5th 3.22/4
6th (Dissertation) 3.33/4
B.E. (ELECTRICAL) SSEC,BHAVNAGAR Bhavnagar University, Gujarat Aggregate 63.17% 2007
HSC P.V.MODI HIGH SCHOOL Rajkot G.S.E.B, Gujarat 60.15% 2003
SSC A.S.Chowdry high school Rajkot G.S.E.B, Gujarat 75.86% 2001

Additional Information

Training imparted by GSECL:

Content of Training Place of Conduct Date
Power plant Familiarization NPTI, FARIDABAD. 2.11.2009-to-28.11.2009
SPPA-T3000 SIMULATOR ERLANGEN, GERMANY. 1103.2013-to-5.03.2013

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.