RF Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 6 years
Relocation: Yes - Internationally
Career Objective
To solve the problem related to RF,
Professional Experience
Six year of Experience in Telecom. Six month in plant training in "Global Network Solution" in Tamil Nadu working with CERAGON equipment for VODAFONE Six month of experience in "Microtech Telecom Services" in Maharashtra working with NEC equipment for TTML. Two year and four Month experience in "S2 Infotech Pvt.Ltd" as O&M engineer for TTML(Tata Teleservices Maharashtra limited) through "Arya communications & Electronics services Pvt.Ltd" Presently working in Cosmo Telecom Managed Services & LLP as O&M engineer for TTL(Tata Teleservices limited) in Aurangabad since 1 April 2012 Completed training of IP-10(IDU) of CERAGON in CERAGON Completed 15 days workshop of PLC from Gov Poly, Aurangabad
Eductation
Educational Qualification: M.E (Communication Engineering) with first division (67%) from Marathwada Institute of Technology, Aurangabad. Affiliated with Dr.BAMU in year 2014 B.Tech(Electronics And Telecommunication) final year first division with distinction (71.82%) from Maharashtra Institute of Technology, Aurangabad. Affiliated with Dr.BAMU in year 2009 H.S.C. from Aurangabad divisional Board with first division (61.17%) in Feb-2005. S.S.C. from Aurangabad divisional Board with second division (50%) in Mar-2003.
Additional Information
Technical Skills Installation of CERAGON equipment for SDH links Installation & Commissioning of CERAGON IP-10(IDU) Installation of NEC equipment for SDH & PDH links Commissioning of both CERAGON & NEC equipment for PDH& SDH links N.M.S for both CERAGON & NEC equipment Maintenance of NEC Passolink Neo, Passolink CPV, Passolink V4, Passolink+ and ipasso Microwave links Maintenance of RADMIN Maintenance of ECI, Loop & Prima UBR Maintenance of Loop Modem Commissioning of ECI, Prima & Loop UBR Management of ECI, Prima & Loop UBR Commissioning of Modem IP 6702, IP 6700, P6702, IP Mux (Rad Modem) Installation of Huawei GSM, CDMA & 3G B.T.S LOS survey of Microwave and BTS Installation & Commissioning of BG-20 Commissioning of Mico-SDM Installation of F.M.S Creating NCT files for NEC Microwave NMS of NEC for Both NCT based and Autodiscovery based Configuration of Battery Bank Configuration of IP-10 & IP-20 CERAGON microwave link Installation & Configuration of BG-20 & micro SDM of ECI. Maintenance of transmission equipments Monitor of all 2G, GSM, CDMA & 3G sites Monitor of all external alarms Monitoring of all microwave links on PNMS server Pending faults follows up & escalation until the resolution Carry out all integration, Expansion, reconfiguration and recovery of various various microwave nodes in the assigned region. Basic knowledge of Fiber optics. Customer support services Maintenance of PRI, IPS, MPLS and lease line services Help desk for microwave troubleshooting
Hot Categories
Chemicals
Batteries