Electrical Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 1 years
Relocation: Yes - Internationally
Career Objective
Any organization's success depends upon the capability of its staff to grasp a problem, evaluate the best way to unravel it, and then work in collaboration with each other until the solution is in hand.
Professional Experience
Work Experience:
Instrument and Control Engineer at an erection site of Guddu power plant under consulting company NESPAK (AUG 1st to Till )
• I worked on defect liability claim period and punch list item
Instrument Engineer at an erection site of United Energy Pakistan (Naimat Phase 5A) under Electrical and Instrumentation Contractor, Flowtronix Limited (Dec 14 to Till )
• Calibration, installation and termination of instruments, function tests of valves.
• Supervising field work like cable laying, support installation, loop testing etc.
• Learned to read all related drawings i.e. P&IDs, Hook Ups etc.
• Erection, maintenance and testing of HV/MV/LV Switch gears.
• Planning ,reviewing and editing of technical documentation with clients and making the cutting plan of cables.
• Also gained rudimentary knowledge of electrical machines and process of Gas Plant.
Internship at INTECH PROCESS AUTOMATION (1 Month )
• Developed the understanding how to read P&I Diagrams.
• Developed the understanding of HMI , PLC how they work in industry.
• Developed the understanding on Instrument in their training sessions at Intech.
Internship at KEl (6 weaks in Kohinoor Energy Limited 124 MW Power Plant )
• Understanding the working, maintenance and operation of the Power Plant.
• Developed the understanding of System Protection.
• Understanding how poles of generator change and maintenance of generator .
Trainee Engineer at FT (2 Months in Flowtronix Private Limited )
• Developed the understanding how to design a control pannel on Autocad.
• Understand how to make control panels in workshop.
Internship at FESCO (4 weeks in Faisalabad Electric Supply Company, Pakistan)
• Understanding the working, maintenance and operation of the grid station.
• Developed the understanding of single line diagram
• Responsible for the maintenance of transformer and operation of grid station.
Eductation
Academic Qualification:
• BS Electrical Eng: University of Central Punjab, Lahore -2014 CGPA: 2.8 /4 78%
• FSC Divisional Public School & College Faisalabad 777/1100 70.6%
• MATRICULATION Divisional Public School & College Faisalabad 709/850..84%
Hot Categories
Chemicals
Batteries