OPERATIONS PERSONNEL
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
To work with the existing human and material resources to achieve the set goal and objective of the organization, and continually strive to meet customer satisfaction in all our operations and deliver timely.
Professional Experience
• Schedule equipment and personnel for projects and bass work.
• Ensures that up to date Equipments are used in all operations.
• Nitrogen/Helium Leak Test of Gas plants for Both Offshore and Onshore
• Leak Test and Nitrogen refilling of capital spare parts containers for Total E & P Nig. Ltd.
• Performs Quality checks on Recertified Equipments.
• Schedule and supervise the implementation of all maintenance activities.
• Ensures the full implementation of HSE policies and procedures.
• Ensures that HSE drills and audits are performed as scheduled.
• Ensures daily toolbox talk before any work is done.
• Ensures that all new Employees are inducted.
Eductation
2005 HND Mechanical Engineering Rivers State Polytechnic Bori.
2002 ND Mechanical Engineering Rivers State Polytechnic Bori.
2000 SSCE, EGS Okwuzi, Rivers State.
1992 FSLC Saint Andrews State School One, PH
Certification
Total Quality Management System(TQMS) AQC 2014
ASNT Level2 Inspector (UT, MPT, RFI, PT) GRNL 2013
Industrial Gas Testing &Breathing Apparatus n NISP 2012
Basic Fire Fighting Tolman 2012
Basic First Aid Tolman 2012
HUET Tolman 2012
Survival at Sea (SAS) Tolman 2012
Co2 Pump refilling system and operation Western Bell 2012
Installation and operation of dry ice micro-blast Western Bell 2012
System installation and operation of Dry-Ice machine Western Bell 2012
Additional Information
RECOGNITIONS:
• HSE Appreciation Award of the year. 2014.
• Best Staff of the year Award 2013
KEY ACHIEVEMENTS
• Lead Operator of Nitrogen Purging of 18” x 1.6KM Gas Pipe line and Metering station for Gbarian NIPP Lot2 GMS project. - 2014
• Lead Operator of Nitrogen leak test of GPAL/SPDC AGG Gas plant Extension project. - 2014.
• Lead Operator of Nitrogen purging and leak test of NGC Gas plant facility Extension project, Ikeja Metering station, Lagos. 2013
• A Member of the Western Bell team which successfully handled the USAN Turbo generators A/C coolers Lifting and Extraction Work in 2013.
• Handled the cryogenic cleaning of the Rotor and Core of an A/C Turbo generator for TOTAL-USAN project in 2012.