Egypt Zones accountACCOUNT

POWER PLANT ERECTION & COMMISSIONING PROJECT WORK


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 1 years
Relocation: Yes - Domestically

Industry Experience
1 years Mechanical Engineer

Career Objective

• To acquire a position more suited to my skills and capabilities. I intend to pursue a deep rooted career in Project Work, Maintenance work related prospectus suited to my knowledge criteria.

Professional Experience

Company: WRC ENGINEERING CO PVT.LTD. (Take Power Plant Project)
Period : 21-Jan-2014 to 30-June-2015
Job Title : Site in Charge
Job Description
• Erection Commissioning and Installation of Dust Suppuration System, Dust Extraction System &Ventilation System.
• Installation & Maintenance of All types of Pump, all valves, Actuator, Compressor R-55 KW to R-75 KW.
• Piping of cooling water pump, Service water pump, Dry fog Water pump &Compressor R-55 KW to R-75KW.
• All the system controlled by PLC who’s operated by our client at Power Plant.
• Flow Activation System box, Presser Regulator Valve box operated by PLC.
• Attending leakage of Water & Air line piping by Hydraulic Testing System at the end of Project Completed.
• At the end of the Project Work. We checked the all system by PLC then handover to client.
• Co-ordinate with design and development and manufacturing department for timely delivery of projects.
• Handling shift exigencies in coordination with all plants.
• Billing process of Erection Commissioning Project.
• Working exposure of Hoist, Materiel Handling.
• Reporting for daily working, Wages sheet of worker.
• Preventive maintenance and planned maintenance

Eductation

BE (Mechanical Eng) from
Government Engineering Collage,Valsad Gujarat Technological University 2013 6.85/10
HSC from Dz Patel Higher Secondary School, Vallabh Vidhyanagar GSHEB 2009 63.80
SSC from S D Desai High School, Vallabh Vidhyanagar GSHEB 2007 76.62

Certification

Knowledge about Microsoft office, Ms Word-2000

Additional Information

Project Title:
“HYDRAULIC ASSEMBLY DESING AND FABRICATION FOR MANUALLY OPERETED HYDRAULIC HAND PALLET TRUCK”
Problem Summary:
In over institute consist of several laboratories and workshop which have many heavy machines as well as models. The purpose of this project is to make a device which can lift and carry these machines from one place to another conveniently in our institute. Hydraulic hand pallet truck is found suitable for said purpose.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.