Job profile:
FEB’15 TO DEC’15 WITH AL BAHR AL ARABI MARINE ENGG SERVICES, SHARJAH HFZA
PROJECT / LOCATION: OIL STORAGE TANKS PROJECT (VALUE: USD 20 MILLION), SHARJAH (UAE)
CLIENT: ARZOO INTERNATIONAL FZE
CONSULTANT: CAPITAL ENGINEERING CONSULTANTS
PROJECT / LOCATION: OIL STORAGE TANKS PROJECT, SHARJAH UAE
CLIENT: NT PETROLEUM FZE
CONSULTANT: CAPITAL ENGINEERING CONSULTANTS
MAY’ 11 TO OCT’14 WITH BRIDGE AND ROOF COMPANY INDIA LIMITED, INDIA.
PROJECT / LOCATION: SPM CRUDE OIL TANKS PROJECT (VALUE: USD 6.8 MILLION), INDIA
CLIENT: BHARAT PETROLEUM KOCHI REFINERY, KOCHI
CONSULTANT: FACT ENGINEERING AND DESIGN ORGANISATION.
PROJECT / LOCATION: 6 NOS WHITE OIL TANKS PROJECT (VALUE: USD 5.5 MILLION), INDIA
CLIENT: MRPL-ONGC, MANGALORE.
CONSULTANT: UHDE INDIA LIMITED
Eductation
Educational Qualification:
1. Bachelor of Engineering in Mechanical studied at Government College of Engineering, Tirunelveli- (Affiliated to Anna University, Tirunelveli) and Overall Percentage: 72.31% in April 2011.
2. Higher Secondary 12th std. Studied in St. Mary’s Higher Secondary School, Dindigul and secured 89.58% in March 2007.
3. High School 10th std. Studied in St. Mary’s Higher Secondary School, Dindigul and secured 91.60% in April 2005.
Additional Information
Technical Skills
1. Mechanical Construction of Oil tanks including fabrication, erection and commissioning.
2. Oil tanks construction including fabrication, erection and commissioning as a EPC Project.
3. As per API 650 code tanks and pipes erection.
4. Manpower management, material management, SAP, Planning and scheduling.
5. Welding Quality Control and Quality Assurance.
6. NDT of Radiography and ultrasonic test of welding joints in pipes and tanks.
7. ITR, WPS and PQR follow up and activities.
8. Drawing approval and as built changing and maintain the records.
9. Inspection with client and Third party consultant.
10. API 650 code standards following procedure and execution.
11. Hydro testing and pneumatic testing of tanks and pipes.
12. Pigging of pipelines with pig launcher.
13. DPT, MPI, Vacuum Box testing.
14. Coordination and communication with client managers and Execution along with the requirements.
15. Supplier and sub-contractor handling and follow-up.
16. In charge of Whole project including civil, Mechanical and electrical.
17. Maximum of 37000 cubic meter oil storage tank and 3.1 km 12inch oil pipeline fabrication, erection and commissioning.
18. Pump room Electrical and Instrumentation through synchronizing panel to control room