Production Engineer or Petroleum Engineer or Production Technolist
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 15 years
Relocation: Yes - Internationally
Career Objective
A Petroleum (Production Engineer) position to maximize hydrocarbon portfolio by identifying and maturing business opportunities on the basis of reservoir and production monitoring, field development planning, execution and completion strategy.
Professional Experience
PT. Chevron Pacific Indonesia (Chevron IndoAsia)
Petroleum (Production, Completion and Reservoir) Engineer 2000 – 2005
Field Optimization Program and Execution
Responsible to manage assets of 40,000 bopd production in Minas Field and 20,000 bopd production in Balam Field by proposing workovers with any tool application and pump optimization programs and developing infill wells projects. Succeed to maintain even increase production with various initiatives.
Waterflood Management
Minas and Balam South fields have applied peripheral and pattern waterflood for more than 10 years. Production and injection scheme is of multilayer with contrast reservoir properties.
Business Planning
Develop business plan, apply risk and uncertainty evaluation, project scheduling and workover strategy.
Project Engineer 2005 – 2008
Generating and Updating Plan Of Development (POD)
Developing POD is a multi-disciplinary work, in which an assessment each member provides is as valuable as how we integrate them all into final plan
Project Manager of Balam Telisa Area 2 Field Development Project
Control and manage execution activities for all project scope. The project included developing 91 wells with various completion strategies.
PTT Exploration and Production (Thailand National Oil Company)
Engineer, Reservoir and Production Technology 2008 – Feb 2011
• Reservoir and production engineering review
BWP MERUAP. TAC PERTAMINA (Indonesia National Oil Company)
Senior Engineer, Petroleum Mar 2011 – Dec-2012
• Project manager of waterflood pilot project in Meruap Field. The scopes including : study GGRP, initiate,and monitoring
• Lead of production optimization with
Petronas Carigali Sendirian Berhard - PCSB (Malaysia National Oil Company)
Senior Production Technologist Dec 2012 – Now
• Lead of Production Technology Segment in Sepat Development Field (Offshore)
• Lead of production monitoring, optimization, and technology application in Sepat and Dulang Field Development with scopes :
• Gas lift optimization and create company guideline for MRT
Eductation
1994 – 1999
Institute of Technology Bandung (ITB), Bandung, West Java, Indonesia
Bachelor of Engineering / Major: Petroleum Engineering
Graduated with GPA 3.01 (max. 4.00)
1998
Practical Training for 1.5 Month in Java Ocean (offshore) on CNOOC platform
Certification
Dec, 2011 Reservoir characterization and applied reservoir engineering.
July, 2010 Flow Assurance workshop, focus on scale/sand problem and hy-fracturing
Mar, 2009 ESP and gas lift design
June 25th, 2007 Integrated Production Monitoring, PROSPER, GAP, MBAL
May 7th, 2007 Reservoir Monitoring and Production Logging Evaluation by Dr A. Dan Hill from PETROSKILL
May 29th, 2006 Hydraulic Fracture Analysis using the FracproPT (Pinnacle)
Apr 4th, 2005 Production Optimization and Artificial Lift
May 11th, 2004 Petroleum economic and decision analysis (Merak/PEEP and D-Tree software, Petroleum Economic Analysis).
Jun 10th, 2002 Formation Damage and Stimulation (Practices)
Oct 29th, 2001 Waterflood Management School and EOR
Sep 18th, 2000 Well Completion and Stimulation Practices in Horizontal Well
Additional Information
Fifteen years’ experiences in fields development, reservoir engineering, production technologist and optimization, waterflood and Surveillance, Plan on Development, Execution Project Manager, and various completion w/ difference reservoir characterization. Good leadership, strong communications, interpersonal skills, good relationship, adaptable and cooperative, and responsible.
Willing to work extra hour, work effectively between team and individual and get things done on timely manner. Capable to identify and analyze opportunities in reservoir and well problems and come up with recommendation for best solution. Set, execute, and monitor the goals are carried out as planned. Comply with Company policies and always uses “Company-First” to achieve Company strategy objectives.
NO violation and accident during ten years working in oil industry.
Hot Categories
Chemicals
Batteries