Egypt Zones accountACCOUNT

nelson cv


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 6 years
Relocation: Yes - Internationally

Industry Experience
3 years Quality Control/Quality Assurance Engineer
2 years Quality Control/Quality Assurance Engineer
1 years Quality Control/Quality Assurance Engineer

Career Objective

QA/QC Engineer

Professional Experience

• Review the shop drawings and specifications for all the welding, NDT testing, surface preparation
• Perform fit-up and dimension inspection and monitor all stages of welding and final visual welding inspection.
• To control and verify welding consumable and welder , welding operators certificate.
• Witness NDT such as UT, MT, and PT performed by NDT companies.
• welder qualification certificates, non-destructive testing (NDT) procedures, qualification of NDT personnel, work instructions, repair method statement etc.
• Ensure the welder is qualified for that job and using the applicable WPS.
• Ensure that welding parameters are according to the approved welding procedure.
• Ensure that the welding machines are calibrated.
• Maintain the daily weld log and welding summary.
• Coordinate with third party inspection agency and client , sub-contractor and supplier.
• Assess defects as to either repairing, Re-welding should be monitored.Re-inspect completed repair
• Carry out any necessary repairs and Control of distortion
• Repair procedure and welding code should be authorised.Defect area should be marked positively and clearly.
• Check when partially removed and fully removed (visual and NDT).and prepare compile inspection reports.

Eductation


Level: Bachelor of Engineering (Mechanical)
School: Anna University

Certification


 Certified Welding Inspector by Cswip (Cswip-wi-6-92 issued by Twi)
-Certificate no. : 76324
 ASNT Level II for magnetic particle testing (MT), penetrant testing (PT), radiographic testing (RT), and ultrasonic testing (UT)

Additional Information

 Quality plan is authorised and endorsed with signature, date and company stamp.
 Application standard is up to date with the latest edition, revision or amendment.
 The drawings are clear, the issue number is marked and the latest revision is used.
 Welding procedure sheets (specifications) are available, have been approved and are employed in production.
 Welder qualifications with identification and range of approval are verified
 Calibration certificates, material certificates (mill sheets) and consumer certificates are available and valid.
 Parent material identification is verified against documentation and markings.
 Correct methods are applied for cutting and machining.
 Identification of welding consumables such as electrodes, filler wire, fluxes, shielding and backing gases
 Plant and equipment are in a safe condition and adequate for the job.
 Preheat and interpass temperatures must be monitored.
 Interpass cleaning - chipping, grinding, gouging, must be monitored.
 Root and subsequent run sequence.
 Essential variables such as current, voltage, travel speed to be monitored.
 Conformity with drawings and standards requirements.
 Post weld heat treatment, if any, monitored and recorded.
 NDT carried out and reports assessed.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Hydrostatic Testing » News » Inspection » News » Laboratory Services » News » Non Destructive Testing » News » Testing » News » Testing & Inspection Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.