Reference | RFP-2182 |
Date | 6/6/2010 |
Location | Middle East |
Scope | 1- The contractor shall provide water well services for oil and gas wells, all necessary tools / equipment and materials for performance of the services. 2- The contractor shall manage, direct, supervise perform and control the services and all associated obligations and operations as described in this contract including the provision of personnel, transportation, operation, maintenance and repair of equipment with all ancillary and associated items and shall assume the obligations, liabilities, and rights as specified in the contract. Consequently, except where explicitly stated as being provided by the company herein, the contractor shall perform all the services. 3- The water well support work locations shall be an area based in (North Kuwait, West Kuwait, and South and East Kuwait) and adequate equipment, vehicles, and manpower must always be available to be able to carry out ESP operations in all 3 areas simultaneously whenever needed. 4- The contractor shall mobilize its crew and equipment within six months from the date of commencement. 5- Work shall generally be scheduled for daylight hours however work at night may also be required and the contractor shall be prepared for carrying out such works at short notice as directed by the superintendent of the contract. 6- The company does not guarantee the extent, quantum, value or continuity of the services; however, each system which the company requested during the contract period shall be guaranteed by the company to be utilized for two years period. The contractor shall alert the superintendent if a request is raised by the company, where the remaining period of the contract does not sufficiently cover the guaranteed two years period. 7- The contract is non-exclusive and will not prevent the company from contracting with third parties for performance of services similar to the services nor from utilizing their services. 8- The contractor shall provide the services as and when directed and approved in writing by the superintendent of the contract. 9- The contractor shall be responsible for all housekeeping responsibilities around the water wells, the generators and the diesel fuel tanks. This includes ensuring there is no diesel spillage near the fuel tanks or the generators. Contract period: five years. |
Bid Bond | KD 120,000 |
Documents Price | KD 2,000 |