Potable Water Pipeline Network
Pipe Lines Installations
Reference RFP-2213
Date 6/17/2010
Location Middle East
Scope The works comprise detailed design and engineering, material specification procurement and supply of all materials, tools and equipment, fabrication, erection, construction, inspection, testing, pre-commissioning and commissioning of potable water supply network from South Tank Farm (“STF”) through Abduliyah Pump Station (“APS”) and Minagish Water Injection Plant (“MWIP”) to West Kuwait consumers, consisting mainly of HDPE material and installation of two electric driven pumps at STF, two electric driven pumps and two GRE panel type tanks at APS, one GRE panel type tank at MWIP, with all associated mechanical, piping, electrical, civil, instrumentation and control works.

Bidding Information

Bid Bond 2.5% of the bid price
Bond Validity 90 day
Documents Price KD 300
Pipe Lines Installations
Related Prooducts: Pipe Lines Installations Civil Works Civil Works - General Construction Contractors Electrical Engineering Procurement and Construction (EPC) General Installations for water/waste water plants Mechanical Pipe Lines Installations Pumping Stations Steel Works
Related Tenders: Civil Works Civil Works - Finishing works Construction Contractors Electrical Works Engineering Procurement and Construction (EPC) Engineering Procurement and Construction Management (EPCM) General Mechanical Works Pipe Lines Installations Steel Works

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.