Reference | GT10105600 |
Date | 6/24/2010 |
Location | Middle East |
Scope | Engineering, Procurement, Installation and Commissioning to complete the twenty Instrumentation Plant Change Requests (PCRs). Contractor shall verify existing engineering designs and drawings for each PCR, carry out survey, perform all detailed design engineering, supply all material and construct/install to complete all PCR works. |
Bid Bond | QAR 200,000 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500 |