Scope |
The work will include all the facilities to gather, well test and ship a total of (10,000 Barrels of oil, 5,000 Barrels of water & 3 MMSCF) per day to the oil station for process. The scope of the facilities project includes electrification of 6 new wells, new flow lines of 6 new wells, reroute flow lines from 3 existing wells to manifold of the new gathering station, test separator, multiphase pumps, fire fighting system, 34.5Kv substation, control building, utilities, trunk line to the location and tie in /interface to the oil station facilities. |