| Reference | SOR 2078 R1 |
| Date | 8/24/2010 |
| Location | Africa |
| Scope | The work will include all the facilities to gather, process, condition, treat and ship a total of 18,000 Barrels of oil per day. The scope of the facilities includes re-route flow lines from wells to manifold, oil processing train, one produced water treatment facility having design capacity of 30,000 BWPD, and oil export pipeline. |
| Offer Validity | 120 days |