Reference | 57-2010 |
Date | 9/1/2010 |
Location | Middle East |
Scope | The project includes but not limited to the following: 1- Metering Station which will be constructed inside the fence of Adra buses garage which located in Adra city, with 0.7 MMSCMD capacity consist of: - Two metering trains with filters - Stand-by diesel generator - (PLC) control system - Blow down / VENT - All kind of utility system needed 2- Gas pipeline 10”, length about 13 km approximately, extends from the existing AFPC PR&MS which located near the fence of Adra cement plant to new metering station at the Adra buses Garage. 3- Launcher at the existing AFPC PR&MS near the fence of Adra cement plant. 4- Receiver at the new Metering Station which will be constructed inside the fence of Adra buses Garage. 5- Tie-ins with existing AFPC PR&MS, which located near Adra cement plant fence. With all related piping, materials, equipment, instrumentation, electrical, control and telecommunication systems, mechanical, civil and cathodic protection system, in addition to all auxiliary and utility systems like potable water, sewer, etc, to be handed over to the company safe and operable project. |
Bid Bond | Euro 40000 |
Bond Validity | 180 day |
Offer Validity | 180 day |